Road surfacing, method of constructing road surfacing, and concrete form
A hard road surface and roadbed technology, applied to roads, roads, pavement details, etc., can solve problems such as troublesome paving operations, bicycle or motorcycle traffic obstacles, etc., and achieve good drainage, prevent spreading, and suppress temperature rise.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
no. 1 Embodiment approach
[0038] figure 1 This embodiment shows that it is applicable to roads of so-called L traffic {less than 100 (units / day, directions)}, and further applicable to roads of B traffic {250 or more and less than 1000 (units / day, directions)}. In the hard pavement section of the hard pavement body 1, on the basis of laying the middle part 12, the surface part 11 formed by the material b having a water-permeable function is laid, and the roadbed 1a is formed by these two layers, wherein the middle part 12 is made of mixed It is composed of a porous aggregate mixture a of a porous material, namely coal cinder (CA) and a cement-like solidified material.
[0039] Coal slag is a substance that contains about 15% of finely pulverized coal in coal ash generated by high-temperature combustion (1300°C) in thermal power plants or steel plants, etc., and the particles after combustion are contained in the boiler The substances formed by agglomerating with each other, falling down and accumulati...
no. 2 Embodiment approach
[0057] image 3 The shown hard pavement body 2 forms the surface layer 21 by laying the porous aggregate mixture a to form the middle layer 22, and laying the surface layer material having a water-permeable function, that is, the water-permeable asphalt mixture b to form the surface layer 21. This point is different from the roadbed of the above-mentioned embodiment 1a is basically the same, and is a hard pavement body with water absorption and water permeability. Moreover, in this embodiment, a crushed stone roadbed c is provided under the middle part 22 formed by the porous aggregate mixture a to form the second middle part 23, and a porous material d not containing the mixture is arranged below it. And the base part 24 is formed, and the roadbed 2a is comprised by this. The porous aggregate mixture a is a mixture obtained by mixing at least a cement-based hardening material with cinders and compacted, and the surface material b is a water-permeable asphalt mixture. On the...