Method for preventing rib spalling of coal wall and roof falling in head face and hydraulic support thereof
A technology of hydraulic support and coal wall, applied in the direction of mine roof support, earthwork drilling, mining equipment, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] The invention discloses a method for preventing coal wall slab side and roof caving in front of the frame, which comprises the following steps:
[0026] (1) In the roof fall prevention step, the beam end distance of the hydraulic support is reduced to less than 240mm, or even the beam end distance can be made zero, that is, the telescopic beam of the hydraulic support rests on the coal wall, and the shearer leaves a gap when mining coal. The lower 200-300mm thick top coal seam is not cut, and the front end of the telescopic beam is provided with planing teeth for shoveling the top coal seam, and the beam end distance is reduced, so that the area of the unsupported roof is reduced, and the possibility of roof collapse in front of the frame is reduced Greatly reduced, when the telescopic beam completely leans against the coal wall, the occurrence of roof fall in front of the frame can be completely eliminated. When the shearer is mining coal, a 200-300mm thick top coal s...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com