Test method for evaluating grit chamber degritting effect in sewage pretreatment phase
A technology of sewage pretreatment and testing method, applied in the direction of removing certain components, weighing, analyzing materials, instruments, etc., can solve problems such as hidden dangers caused by production and operation, clogging of filter cloths of sludge dewatering machines, and complicated process operations. , to achieve stable and accurate test data
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0030] This example is used to test the sand removal effect of the grit chamber in the pretreatment of urban sewage, and the scale of the grit chamber is 200m 3 / h, use 80-170 mesh standard sieve to distribute sand, sampling device includes submersible sewage pump (15m 3 / h), ball valve, steel wire hose, support, settling device (500L), etc., the hydraulic retention time of the settling device is 6.5min.
[0031] A test method for evaluating the sand removal effect of a grit chamber in the sewage pretreatment stage, specifically comprising the following steps:
[0032] (1) Continuously take raw water samples for 4 hours in the turbulent flow area of the inlet channel of the grit chamber, and use a 500L settling device for settling operation. The mud-sand mixture collected by the settling device is wet screened with a 35-mesh screen and rinsed, and then placed in a 103- Baked in a drying oven at 105°C to constant weight, and finally sieved and weighed, the amount of sand obt...
Embodiment 2
[0041] This example is used to test the sand removal effect of the grit chamber in the pretreatment of urban sewage, and the grit chamber has a treatment scale of 1200m 3 / h, use 80-170 mesh standard sieve to distribute sand, sampling device includes submersible sewage pump (15m 3 / h), ball valve, steel wire hose, support, settling device (500L), etc., the hydraulic retention time of the settling device is 5.5min.
[0042] A test method for evaluating the sand removal effect of a grit chamber in the sewage pretreatment stage, specifically comprising the following steps:
[0043](1) During the sampling period, take raw water samples continuously for 3 hours in the turbulent flow area of the grit chamber inlet channel and use a 500L settling device for settling operation. Dry in a drying oven at 103-105°C to constant weight, and finally sieve and weigh, and the amount of sand obtained by the sedimentation device during the sampling period is 30g;
[0044] (2) Sand blending: ...
PUM
| Property | Measurement | Unit |
|---|---|---|
| density | aaaaa | aaaaa |
| particle diameter | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More