Connection method between wall and floor and its special connection structure and quick-installed house
A connection structure and connection method technology, applied in the direction of walls, building components, building structures, etc., can solve the problems of time-consuming and material-consuming, and achieve the effect of simplifying the connection structure, solving time-consuming and material-consuming, and improving efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] The embodiment of fast-loading type house of the present invention: as Figure 1 to Figure 4 As shown, the fast-installed house has two floors, and includes an upper wall 1, a floor 2 and a lower wall 3 arranged sequentially from top to bottom, wherein the floor 2 is a concrete floor 2 formed by pouring concrete, and the upper wall The body 1 is composed of an upper composite board 14 and a positioning insert 7 embedded in the bottom of the upper composite board 14, and the lower wall 3 is composed of a lower composite board 8 and a connecting insert 9 embedded in the top of the lower composite board 8, And the upper and lower walls 1, 3 are fixedly connected with the floor 2 through the connection structure. The connection structure includes the embedded part 4 embedded in the floor 2, the positioning insert 5 embedded in the bottom of the upper wall 1, the connecting insert 6 embedded in the top of the lower wall 3, and the bridging connecting insert 6. and the conne...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 