Integral building and carrying method for drilling platform
A drilling platform and integrated technology, applied in hydraulic engineering, artificial islands, underwater structures, etc., can solve the problems of unfavorable loading accuracy, unfavorable loading speed and production efficiency improvement of 300-foot jack-up drilling platform, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0022] The technical solutions of the present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0023] During the loading process of the 300-foot jack-up drilling platform, the protruding connecting beam 2 at the top of the lifting and locking general section 3 affected the smooth entry of the spud leg and spud shoe general section 1 into the well. The fast carrying of the jack-up drilling platform is unfavorable.
[0024] After research, before the hoisting of the total section 1 of the spud leg and spud shoe, install the self-made hinge 4 and use it to tilt the lifting and locking section 3, so as to eliminate the interference between the top connecting beam 2 of the lifting and locking section 3 and the total section of the spud shoe. 1, and then carry out hoisting of the total section 1 of the spud leg spud shoe. When the spud shoe 11 falls to the well, stop the hoisting of the spud leg spud shoe general section 1, ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

