Integral prefabricated ignition furnace lifting structure and mounting method thereof
An ignition furnace, prefabricated technology, applied in transportation and packaging, load hanging components, walking bridge cranes, etc., can solve the problems of difficult construction, low installation accuracy, long hoisting construction period, etc., and reduce the construction work intensity. , The effect of protecting the integrity of the structure and improving the safety factor
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0037] Figure 4 to Figure 7Shown is a kind of overall prefabricated ignition furnace hoisting structure embodiment of the present invention, and this hoisting structure comprises roof frame 1 and a plurality of prefabricated blocks 2, and each prefabricated block 2 is connected with hoisting screw rod 3, and furnace roof frame 1 is provided with There are a plurality of hanging slideways 11, and the upper end of the lifting screw rod 3 of each prefabricated block 2 is provided with a hanging plate 5, after each prefabricated block 2 is hung on the hanging slideway 11 by the lifting screw rod 3 and the hanging plate 5, Slide along the hanging slideway 11 to the installation position where the prefabricated block 2 needs to be installed on the top of the ignition furnace, which greatly reduces the construction work intensity compared with the previous construction method, the safety factor is also improved, and the installation period is shortened; the prefabricated block 2 Sli...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 