Monitoring Method of Horizontal Displacement of Underground Diaphragm Wall
A technology of underground diaphragm wall and horizontal displacement, which can be used in the testing of infrastructure, construction, infrastructure engineering, etc., and can solve problems such as deviation of monitoring data.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0010] Embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings.
[0011] refer to figure 1 When making the reinforcement cage of the underground diaphragm wall 1, the PVC inclinometer pipe 2 is bound in the reinforcement cage, the lower end of the PVC inclinometer pipe 2 goes deep into the bottom of the wall and the upper end is higher than the top of the wall. After the concrete is poured to form the underground diaphragm wall 1 and the pre-embedded PVC inclinometer pipe 2, the type selection, binding quality and joint sealing treatment of the PVC inclinometer pipe 2 shall comply with the "Technical Specifications for Monitoring of Building Foundation Pit Engineering" (GB50497-2009) Require. Plant steel bars on the top of the wall around the pre-embedded PVC inclinometer pipe 2 and pour a 500×500×500mm PVC inclinometer pipe concrete protection platform 4. Relevant requirements of the ribs are implemented, and at t...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 