Cluster management device, system and method

A cluster management and external system technology, applied in the communication field, can solve the problems of high load of small and medium-sized servers, increase in the number of prepaid users, and high cost, and achieve the effect of saving investment costs, reducing resource waste, and realizing load dynamic balance

Inactive Publication Date: 2014-03-26
TELEFON AB LM ERICSSON (PUBL)
View PDF5 Cites 18 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] At present, the 3G billing system in the telecommunications industry mostly adopts centralized server deployment and operation. The server generally has high stability and reliability. However, with the development of 3G services, especially the rapid development of data services, prepaid users supported by real-time billing Both the number and self-paid packages have increased significantly, resulting in the excessive load of small and medium-sized servers deployed with the billing system, which will face high risks during periods of high business occurrence. Therefore, it is necessary to continuously upgrade applications and servers to higher-end servers. However, when the business volume growth of centralized deployment requires expansion, a large project must be implemented, which will affect the normal operation of the business, and because the communication business has seasonal business volume concentration and high incidence, for example, the SMS business volume during the Spring Festival is several times that of usual times. Procurement of servers needs to refer to the maximum business volume, so the cost is high

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Cluster management device, system and method
  • Cluster management device, system and method
  • Cluster management device, system and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0034] Embodiments of the present invention provide a cluster management device, a management system and a management method, in order to avoid waste of resources when the normal business volume is small, and at the same time meet the requirements when the business volume is high.

[0035] In order to enable those skilled in the art to better understand the solutions of the present invention, the following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only It is an embodiment of a part of the present invention, but not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts shall fall within the protection scope of the present invention.

[0036] An embodiment of the present invention prov...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a cluster management device, system and method. The cluster management device employs a server cluster manner, wherein according to the types of request messages and performance of server nodes, a conversation management module selects internal server nodes for issuing the request messages of external systems, thereby realizing dynamic load balance. Thus, the number of cluster server nodes is increased at peak time and decreased at normal time, thereby saving the investment cost, reducing the resource waste, and not influencing service operation.

Description

technical field [0001] The present invention relates to the field of communication technology, and in particular to a cluster management device, management system and management method. Background technique [0002] At present, the 3G billing system in the telecommunications industry mostly adopts centralized server deployment and operation. The server generally has high stability and reliability. However, with the development of 3G services, especially the rapid development of data services, prepaid users supported by real-time billing Both the number and self-paid packages have increased significantly, resulting in the excessive load of small and medium-sized servers deployed with the billing system, which will face high risks during periods of high business occurrence. Therefore, it is necessary to continuously upgrade applications and servers to higher-end servers. However, when the business volume growth of centralized deployment requires expansion, a large project must...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): H04L29/08H04L12/803
Inventor 王金铨黄代良殴哲毅
Owner TELEFON AB LM ERICSSON (PUBL)
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products