A method for automatic fault judgment and control of a distribution network powered by a ring network cabinet
A technology for automatic judgment of distribution network faults, applied to electrical components, emergency protection circuit devices, etc., can solve the problems of different switchgear, failure to achieve application effects, high construction costs, etc., and achieve moderate investment costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0023] Assume that the distribution cable network is: small resistance grounding method, the substation outlet circuit breakers CB1 and CB2 are configured with a definite time limit phase overcurrent protection delay: 0.3 seconds, a definite time limit zero sequence overcurrent protection delay time: 1.0 seconds, a reclosing delay Time: 5 seconds. At this time, the ring network cabinet needs to be equipped with three-phase current transformers, zero-sequence current transformers, and incoming and outgoing line voltage transformers; the power distribution automation terminal is equipped with a unified definite time phase overcurrent protection delay: 0.15 seconds, definite time zero sequence overcurrent Protection delay: 0.5 seconds; configured to trip the fault outgoing line switch outside the unified area, the branch line fault incoming line switch trip, the branch line fault branch line switch to trip with a delay of 2 seconds when the branch line loses voltage, and the non-f...
Embodiment 2
[0036] Assuming that the distribution cable network is: ungrounded or arc-suppression coil grounded, substation outlet circuit breakers CB1 and CB2 are configured with a definite phase overcurrent protection delay of 0.3 seconds, and a reclosing delay of 5 seconds. At this time, the ring network cabinet needs to be equipped with three-phase current transformers, zero-sequence current transformers, zero-sequence voltage transformers, and incoming and outgoing line voltage transformers; the power distribution automation terminal is equipped with a unified definite time phase overcurrent protection delay: 0.15 seconds, Zero-sequence power direction to judge single-phase grounding fault function; configure unified fault outgoing line switch tripping outside the area, branch line fault incoming line switch tripping, branch line faulty branch line switch tripping with a delay of 2 seconds when the branch line loses voltage, and a non-faulty incoming line switch to trip after losing vo...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com