Draining and mining method for coal-bed gas well

A coalbed methane well and coalbed methane technology, which is applied in the direction of mining fluid, earthwork drilling, wellbore/well components, etc., can solve the problems of low liquid production, small pressure drop funnel area, slow drainage and analysis time, etc., and achieve high The effect of daily gas production

Active Publication Date: 2014-10-15
PETROCHINA CO LTD
View PDF4 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to provide a coalbed methane drainage method, which solves the problems of slow drainage and long analysis time

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Draining and mining method for coal-bed gas well
  • Draining and mining method for coal-bed gas well

Examples

Experimental program
Comparison scheme
Effect test

Example Embodiment

[0018] Example 1: Such as figure 1 As shown, a method for drainage and production of a coalbed methane well, tubing 1 is in the wellbore 2; coal seam section 3, analytical pressure 4, coal seam initial pressure 5, pressure drop funnel curve 6;

[0019] On the area of ​​the pressure drop funnel curve 6, because the analytical pressure 4 is less than the initial coal seam pressure 5, the coalbed methane will analytically migrate from the direction of high pressure to low pressure;

[0020] The depth of the well is 1200 meters, the initial coal seam pressure is 7 MPa, and the analytical pressure (that is, as the bottom hole flow pressure drops, coalbed methane begins to resolve from the adsorption state in the coal rock to the free state, and migrate to the wellbore. The bottom hole flow pressure at this time is called For a well with a desorption pressure of 2.5MPa, according to the control concept of "continuous and slow", the liquid level drops 3 meters per day, and it takes 150 day...

Example Embodiment

[0021] Example 2: Such as figure 2 As shown, a method of coalbed methane well drainage,

[0022] The control liquid level is at the second control point, which is below the bottom boundary of the coal seam section 3. At this time, the liquid column in the wellbore 2 is used for pressureless production of the coal seam, and the coal seam is a pure gaseous flow, and gas can be produced in large quantities; avoid slow lowering of the liquid level As a result of the long-term gas-liquid two-phase flow in the coal seam, neither coalbed water nor coalbed methane can be produced smoothly, the area of ​​the pressure drop funnel is small, and the gas production is low.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a draining and mining method for a coal-bed gas well, and belongs to the technical field of coal-bed gas development. A working liquid level quickly descends to 10-30 meters above the coal-bed gas analysis pressure according to an analysis pressure value of coal-bed gas. By the intelligent draining and mining method, the working liquid level is always controlled to 10-30 meters above the analysis pressure; if the working liquid level descends quickly, the draining and mining system is lowered; if the working liquid level rises again, the draining and mining system is raised; therefore gas is not analyzed, and a single-phase flowing state of liquid water with the maximum pressure difference on a coal bed is kept; when the water yield is obviously reduced, about 70 percent of water in the coal bed is drained at the moment, and a pressure drop funnel with a larger area is formed; the liquid level is controlled to 5-10 meters below the bottom boundary of the coal bed so as to ensure that the coal bed section is all exposed above the water in the coal bed; the gas and water two-phase flow, taking the coal-bed gas as a main body and the water as an auxiliary body, of the coal bed is kept, and the generated gas can bring away about 30 percent of the residual water in the coal bed; meanwhile, the flowing pressure at the bottom of the well is controlled by controlling the casing pressure at a wellhead, so that the aim of reasonably adjusting the gas yield is fulfilled.

Description

technical field [0001] The invention relates to a coal bed gas well drainage method, which belongs to the technical field of coal bed gas development. Background technique [0002] The drainage principles formed in the initial stage of coalbed methane development are: smooth, continuous, and slow, and the fluid level drops by 3-5 meters per day as required. Under normal drainage conditions, wells with a depth of about 600 meters need continuous drainage for about 4 months to reach the analysis period; according to this principle, if the well depth reaches 1200 meters or more, it will take about 8 months to reach the analysis period. Analysis, the analysis of the pre-production time is relatively long. Drainage of coalbed methane wells is a process of draining downwater. The more pressurized water in the coal seam is discharged, the larger the area of ​​the pressure drop funnel will be, and the corresponding gas production will be more. According to the principle of seepage...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E21B43/00
Inventor 梅永贵郭简苏雷崔建斌王立龙刘忠胡秋嘉
Owner PETROCHINA CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products