A Quality Control Method for Tunnel Smooth Blasting
A quality control method and technology of smooth blasting, applied in the direction of blasting, biological neural network model, etc., can solve the problems affecting the stability of tunnel surrounding rock, the initial support quantity and concrete engineering quantity, affecting the quality of tunnel blasting, increasing project investment, etc. problems, to achieve the effect of blasting parameter optimization, cost reduction, and engineering construction satisfaction
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] The present invention will be described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is carried out on the premise of the technical solution of the present invention, and detailed implementation and specific operation process are given, but the protection scope of the present invention is not limited to the following embodiments.
[0027] Such as figure 1 As shown, the embodiment of the present invention provides a quality control method for tunnel smooth blasting, including the following steps:
[0028] In step 101, the control index is acquired according to the factors affecting the quality of tunnel smooth blasting. Factors affecting the quality of tunnel smooth blasting include geological factors, explosive parameters, blasting hole parameters, blasting technology, and construction quality, as shown in Table 1, specifically including surrounding rock grade, joint development degree, groundwater influence, r...