Risk decision method for water retaining standard of non-overflow earth-rock cofferdam
A risk decision-making and cofferdam technology, applied in special data processing applications, instruments, electrical digital data processing, etc., can solve problems such as ignoring the randomness of decision-making indicators
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach
[0090] A large hydropower project in the southwest is an important hydropower station on the main stream of the river basin. The concrete double-curvature arch dam is 278m high. In the initial stage of construction, the diversion plan is to block the annual water-retaining tunnel once. According to the "Hydropower Project Grade Classification and Design Safety Standards" and "Flood Control Standards", the pivotal project is a first-class project with a huge scale of construction. The collapse of the cofferdam will have a significant impact on the construction of the project, so the level of the diversion building is selected It is grade III. For Class III diversion buildings, the corresponding design flood standard for earth-rock type cofferdams is a return period of 20-50 years. The cost of construction diversion is high, and the impact and difficulty are large. The selection of the initial diversion standard is difficult, and the decision of the initial diversion standard sc...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 