Soil excavation method for increasing quantity of open excavated soil in reverse construction of foundation pit earthwork
A technology of earthworks and earthworks, applied in infrastructure engineering, excavation, construction, etc., can solve the problems of slow excavation progress, high excavation cost, and slow excavation, so as to save construction period, ensure the safety of foundation pit, save construction period and The effect of excavation costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] The Outpatient Medical Technology Building Project of Union Hospital Affiliated to Tongji Medical College, Huazhong University of Science and Technology, Wuhan, is located on the bustling Jiefang Avenue in Hankou. The excavation is subject to city control, and a subway station near the south of the project is about to start construction, increasing the pressure on earthwork travel for this project Therefore, it is more advantageous for us to rush to start construction before the subway station. At the same time, the owner requires early business, and the construction period is very tight. Therefore, the foundation pit earthwork excavation method of the present invention is adopted. The specific steps are:
[0031] The first step is to analyze the geological and hydrological conditions in the foundation pit, determine the maximum depth of open excavation in the middle of the foundation pit, and the width and slope of the passive soil around the foundation pit, and adopt th...