A construction method for rapid frame change of 900t concrete box girder of high-speed railway
A technology of concrete box girders and construction methods, applied in bridges, bridge maintenance, bridge reinforcement, etc., can solve many technically difficult problems, and achieve the effect of good adaptability and low comprehensive cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] Attached below Figure 1-7 The invention is described in further detail with specific embodiments:
[0030] as attached Figure 1-7 A quick frame change construction method for a 900t concrete box girder of a high-speed railway is shown, which includes the following construction steps:
[0031] Step 1: Carry out the installation and layout of the construction structure and equipment for on-site replacement;
[0032] Set up the support structure of the cast-in-place concrete box girder 09 on the side of the temporary repair steel beam 07 of the frame hole to be replaced and parallel to the longitudinal axis of the bridge; the support structure of the cast-in-place concrete box girder 09 includes Two cast-in-place beam side buttresses 05 and cast-in-place beam support beams 06 erected on the two cast-in-place beam side buttresses 05;
[0033] Two trestle beams 03 crossing the left and right sides of the bridge hole are set up vertically to the longitudinal axis of th...