A connecting pipe and anti-water technology, which is applied in the field of connecting pipes, can solve the problems of wall damage and falling off, inconvenience for downstairs residents, erosion of cast-in-place concrete, etc., and achieves the effects of low manufacturing cost, convenient installation and simple structure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] Embodiment 1: as figure 1 , figure 2 and image 3 As shown, a waterlogging prevention connecting pipe includes a main joint 1, a branch joint 2 is integrally provided on the main joint 1, and a drainage branch pipe 3 is integrally provided on the main joint 1, and the main joint 1 and the drainage branch pipe 3 communicate with each other. The branch joint 2 and the drainage branch pipe 3 are perpendicular to each other.
[0025] The inlet end of the drainage branch pipe 3 is higher than the outlet end, and the cross section of the drainage branch pipe 3 is rectangular.
[0026] A groove 4 is arranged on the branch drainage pipe 3 , and the bottom of the groove 4 is lower than the centerline of the branch drainage pipe 3 .
[0027] The drainage branch pipe 3 is bonded with a mesh cloth 5 downstream of the groove 4 .
[0028] like Figure 4 As shown, the cross-sectional structure of the bathroom floor is the floor layer 6, the filling layer 7 and the cast-in-place ...
Embodiment 2
[0030] Embodiment 2: as Figure 5 and Image 6 As shown, the structure of the anti-flooding connecting pipe in this embodiment is basically the same as that in Embodiment 1, the difference is that the drainage branch pipe 3 is perpendicular to the main joint 1, and the water inlet baffle 6 is arranged inside the drainage branch pipe 3, and the water inlet baffle The upstream end of the plate 6 is higher than the downstream end.
[0031] like Figure 7 As shown, the anti-logging connecting pipe of this embodiment needs to be used in conjunction with the anti-blocking cover 7 during construction. The board basically does the same thing. After the cast-in-place is completed, the drainage branch pipe 3 is higher than or partly higher than the cast-in-place layer (not shown in the figure), and then the anti-blocking cover 7 is smashed with a hammer or similar tools, so that the accumulated water can flow into the main drainage pipe 3 Connector 1. Since the upstream end of the ...