Method for constructing demand response scheduling evaluation system of simulated peak-shaving unit
A peak-shaving unit and demand response technology, applied in the field of power systems, can solve problems such as scattered resources, difficulty in realizing demand response resources, and small virtual power generation capacity of a single unit
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0083] The present invention will be further described below in conjunction with the accompanying drawings.
[0084] A method for constructing a demand response dispatch evaluation system for simulating peak-shaving units, comprising the following steps:
[0085] Step 1: Determine the evaluation time of demand response scheduling, that is, the total time of ideal peak shaving;
[0086] Let the response time be 2 hours, let 5min be a time period, set 1Δt=5min, and respond at the starting time T s , the response end time T f , that is, the response scheduling evaluation time T f -T s = 24Δt;
[0087] Assume Then the first response period is The second response period is And so on, the 24th response period is
[0088] Step 2: Aiming at the simulated peak-shaving unit, construct a three-level demand response scheduling evaluation system for the simulated peak-shaving unit from the time dimension, capacity dimension and object dimension: the first level is the overall ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com