Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

36results about How to "Have independence" patented technology

System and method for monitoring outdoor display screen by using video image and/or digital photo

The invention relates to a system and a method for monitoring an outdoor display screen by using a video image and / or a digital photo. The system is provided with an image acquisition device, an image monitoring device and a communication device, wherein the image acquisition device is arranged on the front side of the outdoor display screen; and the image monitoring device is connected with the image acquisition device and is provided with an intelligent image identification module, a communication protocol processing module and an intelligent judging and comparing module. The monitoring method comprises the following steps that: the image acquisition device shoots a display content of the outdoor display screen in real time and transmits the shot video and / or digital photo to the image monitoring device; the image monitoring device carries out two types of identification of a point-to-point lattice or an integrated image-text content on the video or the digital photo, and compares aprocessed display screen image lattice file with the original image file of a control center to judge whether the display screen image lattice file is displayed correctly; if a display fault is found, the number of fault lattices is checked in detail to obtain the correct working rate of a light-emitting diode (LED) of the outdoor display screen and automatically generate an alarm signal; and thealarm signal is transmitted to the control center by the communication device, so that maintenance personnel eliminates the fault in time.
Owner:BEIJING SULIANKE COMM EQUIP

Method for constructing demand response scheduling evaluation system of simulated peak-shaving unit

The invention discloses a method for constructing a demand response scheduling evaluation system of a simulated peak-shaving unit. The method comprises: determining demand response scheduling evaluation time; taking the simulated peak-shaving unit as a target, and constructing the three-layer demand response scheduling evaluation system of the simulated peak-shaving unit from time dimension, capacity dimension and object dimension, wherein a first layer is a totality index, a second layer is a generality index, and a third layer is a specificity index; taking an ideal peak-shaving curve as an evaluation target, and constructing the demand response scheduling evaluation system of the simulated peak-shaving unit; and performing analysis on an index system with an evaluation method of an attribute interval recognition theory, and performing scheduling evaluation calculation. The demand response scheduling evaluation system of the simulated peak-shaving unit, constructed with the method, has comprehensiveness, independence, easy measurement property, flexibility and practicality, is helpful for more visually understanding a demand response scheduling result and a user response state in power grid scheduling, and provides a scientific and accurate basis for implementing demand response and settlement.
Owner:STATE GRID CORP OF CHINA +5

Annular jet cooling device for controlled cooling of hot-rolled seamless steel tubes

ActiveCN106311763AHave independenceFacilitates instantaneous and orderly flowTemperature control deviceSpray nozzlesSteel tubePiping
An annular jet cooling device for controlled cooling of hot-rolled seamless steel tubes comprises an upper half water spray ring and a lower half water spray ring. The upper half water spray ring and the lower half water spray ring are identical in structure and symmetrically arranged and communicate with a bypass flow collector pipe. An adjusting valve group is connected between the water spray rings and the bypass flow collector pipe and achieves control over the water spray flow and the water pressure. The outer surfaces of the water spray rings are provided with water inlets. The inner surfaces of the water spray rings are provided with a plurality of cooling nozzles, wherein the cooling nozzles are sequentially distributed. A cooling compensation nozzle is installed between the side ends of the middle attached faces of the upper half water spray ring and the lower half water spray ring. The jet direction of the cooling nozzles and the moving direction of a steel tube form an included angle. The jet direction is towards the positive direction or the reverse direction of the moving direction of the steel tube. According to the annular jet cooling device for controlled cooling of the hot-rolled seamless steel tubes, the water spray flows of the upper half water spray ring and the lower half water spray ring are independently set, controlled cooling can be carried out on conventional hot-rolled seamless steel tubes of any diameters through setting of the number of the opened water spray rings, the water pressure and other parameters, the finish cooling temperature can be accurately controlled, and the annular jet cooling device for controlled cooling of the hot-rolled seamless steel tubes is higher in applicability and significantly improves the cooling evenness.
Owner:NORTHEASTERN UNIV

Method and system for predicting social network information transmission trend

The invention relates to a method and system for predicting the social network information transmission trend. The method includes the steps that information data and user date in a social network are obtained, and a user categorical distribution vector is calculated by means of the user data; normalization processing is carried out on the information data; smoothing processing is conducted on the normalized information data through a moving average method, a Diffusion-Info user categorical distribution vector is combined to figure out predicted points of the information transmission trend, and an information transmission trend line is drawn; a plurality of basic information transmission curves obtained through a K-SC algorithm and the information transmission trend line are fitted to obtain a follow-up trend line of the information transmission trend prediction line. According to the method and system, information transmission capacity can be estimated as soon as possible, hysteresis of a traditional method is reduced, and assistance is provided for timely pushing of information and timely control of public opinions of the social network; meanwhile, when the system operates, cost of an internal storage is low, and high efficiency, independence and transportability are achieved.
Owner:INST OF INFORMATION ENG CAS

Cooling room for internal combustion locomotive

The invention discloses a cooling room for an internal combustion locomotive. The cooling room serves as a module of the internal combustion locomotive to be directly installed on a locomotive chassis. The cooling room comprises a steel-structure frame, an engine water cooling system, a pressurized air cooling system, a transmission oil cooling system, a hydraulic oil cooling system, a cooling fan driving system, a lighting system and an external expansion water tank, wherein the engine water cooling system, the pressurized air cooling system, the transmission oil cooling system, the hydraulic oil cooling system, the cooling fan driving system and the lighting system are installed on the steel-structure frame. Liquid level observation, port connection and maintenance and detachment are facilitated. A transmission oil pressure relief pipeline and an overflow valve are arranged between a transmission oil inlet pipeline and a transmission oil outlet pipeline to prevent the damage, caused by system pressure fluctuation, runner congestion and other circumstances, to heat dissipation. A double-flow-path cooling structure is adopted in the transmission oil cooling system so that a transmission oil radiator can be arranged more flexibly and the structure of the cooling room can be more reasonable. A protection pipeline is arranged between a motor oil inlet pipeline and a motor oil outlet pipeline to mainly prevent the phenomenon that negative pressure is caused in the pipelines due to the fact that hydraulic oil supply is stopped at the moment of the machine halt, and consequently the pipelines are contracted and shrunk.
Owner:CRRC DALIAN INST CO LTD

Crosstalk clearing system, method for keeping tone quality and its parameter design method

The invention is used to remove the cross talk generated from a two-channel sound source. The method comprises: providing a sound inputting device used for inputting a two channel sound source; setting a transfer function relation between the cross talk removing system and the user's head to get an outputted transfer pulse response; setting the antarafacial output transfer function pulse of the outputted transfer pulse response level off to zero; setting the homolateral output transfer pulse response of the outputted transfer pulse response to be delayed than the homolateral head transfer pulse response of the head transfer function; after a reversed calculation, getting the parameter of the cross talk removing system; using the parameter to make filter to get the output signals.
Owner:SUNPLUS TECH CO LTD

SNS-based bus information prompting method and system

InactiveCN110430120ALess dependent on external factorsNo implementation costDetection of traffic movementData switching networksBehavioral analyticsTransit bus
The invention relates to an SNS-based bus information prompting method and an SNS-based bus information prompting system. The method comprises the steps of obtaining bus taking information of each buspassenger; clustering the bus taking information corresponding to the buses in the same bus route and the same direction to obtain the current position information of the buses; and according to theposition information of the bus passenger and the position information of the taken bus, obtaining the distance between the current bus passenger and the taken bus, and calculating the waiting time required by the current bus passenger. The time from the bus to the station is pre-judged through the behavior analysis of the bus passengers, so that the passengers can check the time in advance and make preparations. Meanwhile, the scheme has independence and flexibility and can be in butt joint with existing city bus APPs and can also provide independent APPs. Services are provided for passengers.
Owner:BEIJING INFORMATION SCI & TECH UNIV

Modularized complicated equipment Bayesian network failure prediction method

The invention discloses a modularized complicated equipment Bayesian network failure prediction method, which is used for solving the technical problem of poor practicability of the existing equipment failure prediction method. The modularized complicated equipment Bayesian network failure prediction method has the technical scheme that firstly, complicated equipment is decomposed and modularized according to actual requirements and physical boundaries among components; then, a FPBN (Failure Prediction Bayesian Network) model of each module is built for each module of the complicated equipment by different modeling methods, and the model of each module is further modified so that each module is modularized for forming a FPBNM (Failure Prediction Bayesian Network Module); then, each PBNM is integrated for building an FPBN integrated model of the whole complicated equipment system; and finally, the actual operation state of the equipment is predicted on the basis of the built fault prediction integrated model through using detection information as a drive by using a probability theory formula. The modularized complicated equipment Bayesian network failure prediction method has the advantages that the method is used for the maintenance and the guarantee of the complicated equipment on the basis of the modularization and the Bayesian network; the time state of the complicated equipment can be fast and accurately predicted; the maintenance efficiency is effectively improved; the maintenance cost is reduced; and the practicability is high.
Owner:SHANGHAI GUAN AN INFORMATION TECH

Data definition method of visual chart and implementation chart library thereof

The invention relates to a data definition method of a visual chart and an implementation chart library thereof, and the data definition method specifically comprises the following steps: placing general information of a visual instance at a high-level level, and placing personalized information of the visual instance at a low-level level, wherein the general information comprises an instance identification class, attribute information, auxiliary information and a data overall definition, and the personalized information comprises specific data information, theme styles and chart capability configuration items. According to the data definition method for the visual chart, information such as data, data types, chart styles, charts and instructions behind the chart is defined, and a universal and universal visual data structure standard is formed; based on the data definition, a set of chart component library is achieved, a static chart, an interaction chart and a time axis dynamic chartcan be displayed, the change rule of the data in the time dimension can be displayed, and the pursuit of people for the visual level is better met.
Owner:武汉镝次元数据科技有限公司

Power market development state evaluation method and system

The invention relates to a power market development state evaluation method and system, and belongs to the technical field of power markets. According to the method, firstly, an electricity market development state evaluation index system is established by combining the progress of electricity market reform in China, and the system comprises four first-level indexes and eighteen second-level indexes; then, defining a reference range and a scoring standard of the secondary indexes, establishing a mapping relationship between different index values and scores, and respectively calculating scoresof each secondary index in a certain region to be evaluated; and finally, respectively calculating each first-level index score of the region by adopting a weighting method, and then summing the first-level index scores to obtain a comprehensive evaluation score of the development state of the power market of the region. According to the invention, market participants and related parties are helped to understand the operation condition, existing problems and change trends of the market, necessary basic data is provided for analysis and management decision of the power market, and the method is of great significance to scientific management and healthy development of the power market.
Owner:YUNNAN POWER GRID

Full-automatic assembly line control method and full-automatic assembly line control system

The invention provides a full-automatic assembly line control method and a full-automatic assembly line control system, and the method comprises the steps of: acquiring a medical detection task of a target sample in a hospital laboratory information management system through a control module, determining a target analyzer through the control module, and conveying the target sample to the target analyzer through a conveying track; after the target sample enters an assembly line, controlling the movement of the target sample according to the real-time state of the target sample by the control module and intelligently and dynamically distributing the target sample according to the working condition of the connected analyzer, thus liberating laboratory personnel from time-consuming heavy tasks, improving the detection efficiency, and meanwhile, reducing manual error, and improving the detection reliability. The target analyzer sucks a target sample and sends a detection result to the control module, the control module uploads the detection result to the hospital laboratory information management system for doctors and patients to call and check at any time, the whole process is automatically carried out, the detection result return time is effectively shortened, and the medical experience of the patients is improved.
Owner:BIOSCIENCE (CHONGQING) DIAGNOSTIC TECH CO LTD +1

System for gathering data of distributing simulation platform based on grid

The invention discloses a distribution simulation platform data collection system based on mesh. The system comprises a simulation application terminal provided with a data transmission mould, a simulation data collection service terminal provided with a record management service mould, a playback service mould and a record service mould, and a simulation data collection client terminal provided with a simulation data enquiry and indication mould and a simulation process playback control mould. The simulation application terminal transparently saves collected simulation data in a local data buffer, and saves the simulation data in the simulation data collection service terminal when the simulation is advanced; the service terminal supplies each function in collecting data process to a client layer in mesh service form; the client terminal supplies a user with a function for watching and controlling simulation data collection overall process. The features of the invention are: not interfering normal operation of simulation, extensibility of data collection scheme, ensuring HLA system's openness, flexibility and extensibility, processing federation members' independence and processing federation independence.
Owner:HUAZHONG UNIV OF SCI & TECH

A method for automatically generating log files based on model-driven

The invention provides a log file automatic generation method based on model driving, and belongs to the field of combination of software system structure modeling and log file automatic generation. The method comprises: based on a software system structure modeling idea, coding functional components of all layers of an application program, and using an automatic mapping mode to replace log information containing internal definitions of an application system; and then intercepting user information corresponding to corresponding operation behaviors, generating log contents together with other necessary system description information, and storing the log contents in a log file or database file form. Meanwhile, collection work of the log information can be started or stopped at will by modifying the configuration file, and existing log information can be expanded or deleted according to real-time needs. Physical separation and logic independence of the log system and the application system are achieved, comprehensive, detailed and extensible log content is guaranteed, the application system can be maintained, and the follow-up data analysis work efficiency is improved.
Owner:BEIHANG UNIV

A Construction Method of Demand Response Scheduling Evaluation System for Simulated Peaking Units

The invention discloses a method for constructing a demand response scheduling evaluation system of a simulated peak-shaving unit, including: determining the demand response dispatch evaluation time; taking the simulated peak-shaving unit as the target, and constructing three levels from the time dimension, the capacity dimension and the object dimension The demand response dispatching evaluation system of simulated peak-shaving units: the first layer is general indicators; The evaluation system of demand response dispatching; the evaluation method of attribute interval recognition theory is used to analyze the index system and carry out dispatching evaluation calculation. The demand response scheduling evaluation system of the simulated peak shaving unit constructed by the method of the present invention has comprehensiveness, independence, ease of measurement, flexibility and practicability, and is helpful for power grid scheduling to understand demand response scheduling results and user responses more intuitively State, providing a scientific and accurate basis for the implementation of demand response and settlement.
Owner:STATE GRID CORP OF CHINA +5

Bayesian Network Fault Prediction Method for Modular Complex Equipment

The invention discloses a modularized complicated equipment Bayesian network failure prediction method, which is used for solving the technical problem of poor practicability of the existing equipment failure prediction method. The modularized complicated equipment Bayesian network failure prediction method has the technical scheme that firstly, complicated equipment is decomposed and modularized according to actual requirements and physical boundaries among components; then, a FPBN (Failure Prediction Bayesian Network) model of each module is built for each module of the complicated equipment by different modeling methods, and the model of each module is further modified so that each module is modularized for forming a FPBNM (Failure Prediction Bayesian Network Module); then, each PBNM is integrated for building an FPBN integrated model of the whole complicated equipment system; and finally, the actual operation state of the equipment is predicted on the basis of the built fault prediction integrated model through using detection information as a drive by using a probability theory formula. The modularized complicated equipment Bayesian network failure prediction method has the advantages that the method is used for the maintenance and the guarantee of the complicated equipment on the basis of the modularization and the Bayesian network; the time state of the complicated equipment can be fast and accurately predicted; the maintenance efficiency is effectively improved; the maintenance cost is reduced; and the practicability is high.
Owner:SHANGHAI GUAN AN INFORMATION TECH

Electric power data mining analysis method based on big data technology

PendingCN113377834AAchieve business understandingIntuitive understanding of operationDigital data information retrievalData processing applicationsPower gridEngineering
The invention discloses an electric power data mining analysis method based on a big data technology, which relates to the field of electric power data processing, and comprises the following steps: displaying electric power data in a chart form by adopting a visualization technology; converting the non-stationary time sequence of the visual power data into a stable time sequence by using an ARIMA model, and establishing a stationary time sequence model; repeatedly optimizing the stationary power data of the stationary time sequence model by using a neural network model to obtain an optimization result meeting a predetermined target. The big data technology-based electric power data mining analysis method constructed by the method has independence, easy measurement, instantaneity, flexibility and practicability, and is helpful for visualizing electric power data, intuitively knowing the operation condition of a power grid, monitoring and managing the power grid in real time; the method can analyze a large amount of data, mines mutual relations and internal relations in mass data deeply, and improves the power grid management level.
Owner:SOUTHEAST UNIV +1

Sandy soil fertility promoting circulating system

The invention discloses a sandy soil fertility promoting circulating system which comprises a water storage unit, a backflow unit, a flow seepage and guide layer, a sandy soil protection layer and a plurality of independent water supply and drainage matrixes. Sustainable water circulation is formed by the water storage unit, the backflow unit and the water supply and drainage matrixes, and the water supply and drainage matrixes can be combined to operate or selectively and independently operate. According to the sandy soil fertility promoting and circulating system, the water supply and drainage matrixes have independence and autonomously form a net, combined use or randomly alternative use can be achieved, and the circulating system is more flexible in application. Height differentiatinglaying of the water supply and drainage matrixes can be carried out according to the need for different depths of a sandy soil layer, the selectivity is flexible, and the on-site laying needs of various landforms and terrains are met. The flow seepage and guide layer is adopted for guiding water in sandy soil, a water gathering and flow converging function is achieved, the water circulation use rate of the circulating system is increased, and the sustainability of the circulating system is improved. The structure for the water drainage matrixes and fertilizer applying matrixes is easy to assemble and lay, and construction is convenient and fast.
Owner:TARIM UNIV

System and method for monitoring outdoor display screen by using video image and/or digital photo

The invention relates to a system and a method for monitoring an outdoor display screen by using a video image and / or a digital photo. The system is provided with an image acquisition device, an image monitoring device and a communication device, wherein the image acquisition device is arranged on the front side of the outdoor display screen; and the image monitoring device is connected with the image acquisition device and is provided with an intelligent image identification module, a communication protocol processing module and an intelligent judging and comparing module. The monitoring method comprises the following steps that: the image acquisition device shoots a display content of the outdoor display screen in real time and transmits the shot video and / or digital photo to the image monitoring device; the image monitoring device carries out two types of identification of a point-to-point lattice or an integrated image-text content on the video or the digital photo, and compares aprocessed display screen image lattice file with the original image file of a control center to judge whether the display screen image lattice file is displayed correctly; if a display fault is found, the number of fault lattices is checked in detail to obtain the correct working rate of a light-emitting diode (LED) of the outdoor display screen and automatically generate an alarm signal; and thealarm signal is transmitted to the control center by the communication device, so that maintenance personnel eliminates the fault in time.
Owner:BEIJING SULIANKE COMM EQUIP

a DC power supply

The embodiment of the invention provides a DC power supply including a rectifier circuit and a DC power conversion circuit. The input end of the rectifier circuit is connected to a first power source / load, and the output end of the rectifier circuit is used as a DC bus to be connected to the input end of the DC power conversion circuit such that the rectifier circuit realizes AC / DC bidirectional electric energy conversion. The DC power conversion circuit realizes the DC / DC bidirectional electric energy conversion, and includes multiple bridge arm modules and a plurality of substrates. Each switching device in each bridge arm module is turned on or off based on a corresponding driving signal. The two ends of each bridge arm module are connected to the DC bus. The output end of each bridge arm module is connected with a second power source / load. The bridge arm modules having output ends connected in parallel are integrated into the same substrate. The DC power supply provided by the embodiment of the invention can be improved in the flexible expansibility of the DC power supply capacity while ensuring a good current sharing characteristic between the parallel bridge arm modules by adjusting the number of parallel bridge arm modules.
Owner:南京君海数能科技有限公司

Seafood long-distance transportation device and working method thereof

The invention discloses a seafood long-distance transport device and a working method thereof, and particularly relates to the technical field of marine product transport devices. The seafood long-distance transport device comprises a box which is internally provided with a monitoring platform, the monitoring platform is connected with a controller, seafood storage baskets are arranged at the bottom of the box, an ice separation device is arranged in the middle of the box, an ice storage layer and a water tank are arranged on the upper portion of the box, an ice crushing device is connected tothe ice storage layer, the ice separation device is located over the seafood storage baskets and directly faces an outlet of the ice crushing device, a water pump is arranged in the water tank, waterin the water tank and the seafood storage baskets forms circulation under the effect of the water pump, the ice separation device comprises a left ice separation plate and a right ice separation plate which are connected through a center shaft, the left ice separation plate and the right ice separation plate are located on two planes, and driving motors are connected to the left ice separation plate and the right ice separation plate respectively; in the ice separation state, the left ice separation plate and the right ice separation plate are driven by the driving motors to rotate at a highspeed to separate ice blocks into all seafood storage baskets.
Owner:QINGDAO HUANGHAI UNIV

Demand response effect evaluation method by taking load limit as goal

The invention discloses a demand response effect evaluation method by taking load limit as the goal. The method includes the following steps that firstly, demand response evaluation time is determined; secondly, three evaluation sub-goals are determined by taking load limit as the goal; thirdly, a demand response effect evaluation system by taking load limit as the goal is established according to the judgment standard whether the evaluation sub-goals are strongly correlated; fourthly, per-unit disposal is conducted on important evaluation indexes and auxiliary evaluation indexes, the percentage of each evaluation index is worked out, and the weighting method is adopted for unified solving to obtain an evaluated value. The evaluation method has comprehensiveness, independence, easy measurement, flexibility and practicability, needed data are obtained conveniently and are easy to understand, solving is conducted through the weight factor method, engineering application is facilitated, and the method plays a role in filling the blank in the aspects of demand response / orderly power utilization effect evaluation or demand response allowance standard formulation.
Owner:STATE GRID CORP OF CHINA +3

Power detection method of engine of construction machinery and device thereof

The invention discloses a power detection method of an engine of construction machinery and a device thereof. In the device, a connecting shaft is connected with a power output mechanism of the engine and a power input shaft of a driven mechanism, both ends of a connecting shell are respectively connected with a flywheel shell of the engine and a shell of the driven mechanism, a coupling is provided with a torque induction device, a torque signal transmission primary coil and a power receiving secondary coil, the connecting shell is provided with a power transportation primary coil, a secondary coil used for acquiring a torque signal and a junction box which comprises a power conversion circuit, a torque signal modulation circuit and an external port, the torque signal transmission primary coil is in electromagnetic coupling with a torque signal receiving secondary coil, and the power transportation primary coil is in electromagnetic coupling with the power receiving secondary coil. The power detection device of the engine of the construction machinery has the advantages that the structure is simple and compact, and implementation and maintenance are easy.
Owner:SUNWARD INTELLIGENT EQUIP CO LTD

A method and system for judging mvb work master station equipment

The present invention provides a method and system for judging MVB working master station equipment. The method includes: calculating the threshold parameter D from slave station device i to bus logic port j, wherein i>0, j>0; detecting slave station device i The master-slave frame delay T to the bus logical port j; compare the master-slave frame delay T with the threshold parameter D; if T≥D, then determine that the currently used master device is master device A; if T<D , then it is determined that the currently used master device is master device B. The present invention aims at bus topology structures where MVB master stations are in different network segments, and fully utilizes the delay characteristics of MVB bus data without using other bus-independent information to realize accurate judgment of current MVB working master station equipment. The method is independent and universal.
Owner:CRSC RESEARCH & DESIGN INSTITUTE GROUP CO LTD

Method and system for judging MVB working master station equipment

The invention provides a method and a system for judging MVB working master station equipment, and the method comprises the steps: calculating a threshold parameter D from slave station equipment i toa bus logic port j, wherein i is greater than 0, and j is greater than 0; detecting master-slave frame delay T from the slave station equipment i to the bus logic port j; comparing the master-slave frame delay T with the threshold parameter D; if T is greater than or equal to D, judging that the currently used master station equipment is master station equipment A; and if T is less than D, judging that the currently used master station equipment is master station equipment B. Aiming at bus topological structures of the MVB master station in different network segments, on the premise that other information irrelevant to the bus is not used, the delay characteristic of the MVB bus data is fully utilized, accurate judgment of the current MVB working master station equipment is achieved, andthe method has independence and universality.
Owner:CRSC RESEARCH & DESIGN INSTITUTE GROUP CO LTD

Method and system for safely accessing after-loading equipment into vehicle electronic system

The invention discloses a method for safely accessing an after-loading device to a vehicle electronic system, which comprises the following steps: step S10, after the after-loading device is accessed to an OBD (On-Board Diagnostic) interface, sending encrypted information containing a device ID (Identity) and a pre-stored security certificate of the device to a vehicle-mounted gateway; step S11, the vehicle-mounted gateway initiates an authentication request to a cloud certificate management system according to the received encrypted content; step S12, after receiving the authentication request, the cloud certificate management system decrypts the equipment ID and the security certificate carried in the authentication request; step S13, the cloud certificate management system performs validity and validity verification processing on the device ID and the security certificate, and responds to the vehicle-mounted gateway; and step S14, the vehicle-mounted gateway carries out corresponding processing on the access request of the after-loading equipment according to the response result. The invention further discloses a corresponding system. According to the invention, the security of communication between the after-loading equipment and the vehicle electronic system can be improved.
Owner:GUANGZHOU AUTOMOBILE GROUP CO LTD

A device suitable for underground sewage infiltration treatment and its application method

ActiveCN104229992BSolve the phenomenon of uneven water distributionAvoid difficult recycling challengesTreatment with aerobic and anaerobic processesContaminated groundwater/leachate treatmentWastewaterExpanded clay aggregate
The invention relates to the field of environmental engineering and in particular provides a device suitable for subsurface infiltration treatment of wastewater and a use method of the device. According to the technical scheme, the device is characterized by comprising an upper groove, a lower groove, a water inlet pipe and a vent pipe, wherein a grid supporting plate is arranged at the bottom of the upper groove; a water inlet pipe interface is arranged on the upper side surface of the upper groove and is in threaded connection with the water inlet pipe; a water distribution pipe is arranged at a part, which is 2-4cm away from the top, in the upper groove; the upper groove is filled with light ceramsite with the particle size of 2-3cm or plastic bio-fillers; the lower groove is similar to the upper groove in shape; a lower groove body is 3-5cm wider than an upper groove body and is used for draining the wastewater; the lower groove is filled with 20-100-mesh sand; the upper groove and the lower groove are combined by virtue of a foot plate.
Owner:WENZHOU UNIVERSITY

Sand soil fertility promotion circulation system

The invention discloses a circulation system for sand soil fertility improvement, including a water storage unit, a return flow unit, a seepage diversion layer, a sand protection layer and several independent water supply and drainage matrices, and the water storage unit, return flow unit and supply and drainage matrix form a sustainable water cycle , where the water supply and drainage matrix can operate jointly or selectively independently. The water supply and drainage matrix of the present invention is independent, and forms a network independently with each other, which can realize joint use or arbitrarily selected use, and the application of the circulation system is more flexible; the height difference laying of the water supply and drainage matrix can be carried out according to the requirements of different thicknesses of sandy soil layers , flexible selectivity, to meet the needs of various landforms and terrains; the seepage diversion layer is used to divert the water in the sand and play the role of water accumulation and confluence, which improves the water cycle utilization rate of the circulation system and improves the efficiency of the circulation system. Sustainability; the structure of the water supply and drainage matrix and fertilization matrix is ​​easy to assemble and lay, and the construction is convenient and fast.
Owner:TARIM UNIV

Electric vehicle cluster storage load scheduling evaluation system and evaluation method

The invention relates to an electric vehicle cluster storage load scheduling evaluation system. An electric vehicle scheduling center acquires regional power grid capacity, user load capacity and a power grid operation state; the electric vehicle dispatching center calculates the maximum charging capacity and the maximum dischargeable capacity of all the electric vehicles in the area; the electricvehicle scheduling center respectively transmits the actual capacity index value, the actual vehicle service time index value, the actual safety operation index value, the scheduling plan index and the actual scheduling economic index value of the electric vehicle cluster storage load scheduling system to the capacity index value and the vehicle service time index value of the electric vehicle cluster storage load scheduling system; and comparison normalization processing is conducted on the safe operation index value, the scheduling plan index and the scheduling economic index value to obtain an electric vehicle cluster storage load scheduling evaluation radar map. According to the method, scientific and reasonable evaluation of the storage load scheduling strategy of the electric vehicle is realized.
Owner:国网电力科学研究院武汉能效测评有限公司 +3
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products