A method of constructing and constructing a silt intertidal tidal tidal zone in the estuary that is not suitable for forests
A muddy, intertidal zone technology, applied in the field of agricultural cultivation, can solve problems such as the inability to plant trees to eliminate waves, and achieve the effect of enriching greening tree species, strong salt and alkali resistance, and large growth
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Publication Date
- 2017-11-21
Abstract
Description
technical field
[0001] The invention belongs to the technical field of agricultural cultivation, and relates to a method for afforestation on tidal flat wetlands, in particular to a method for constructing and constructing a tidal arbor wave-dissipating forest belt in a muddy intertidal zone of an unsuitable forest estuary. Background technique
[0002] The estuary refers to a section of the river that enters the sea and is affected by the tide. It is the water area between the land and the ocean, also known as the tidal section. The intertidal zone is the area between the high tide line and the low tide line, usually also called tidal flats. According to the law of tidal activity, the intertidal zone is divided into the following three areas: (1) high tide zone (upper zone): it is located in the uppermost part of the intertidal zone, the upper boundary is the high tide line of spring tide, and the lower boundary is the high tide line of neap tide. (2) Mid-tide area (middle...
Examples
Embodiment Construction
[0025] The present invention will be further described below in conjunction with embodiment.
[0026] The invention provides a method for constructing and constructing an arbor wave-dissipating forest zone in muddy intertidal tidal flats of estuaries that are not suitable for forests, and the constructing and constructing method includes the following steps.
[0027] A. Manually dig trenches and use soil as piers to raise the ground: From January to February every year, artificially dig trenches in the muddy intertidal zone tidal wetland elevation of coastal estuaries that are 10m-60m offshore and are not suitable for forests, or in high and high tide areas with slightly higher terrain 1. Take soil as a pier, reduce salt and lighten it, and then dig a drainage ditch perpendicular to the river bank or coastline, and use the soil dug out of the drainage ditch to pile up the mounds on both sides of the ditch, which can reduce the mound at the same time salinity and groundwater le...