The invention discloses a comprehensive matching technology for constructing road shelter forests in heavy
saline-
alkali soil sections of coastal areas, which is characterized in that after high-specification platform field forming and
soil preparation,
plant materials of the shelter forests are planted after one year of land baring, field
drying, freezing and soil improvement as well as one year of deep
tillage, mature
tillage and
green manure planting. The comprehensive matching technology comprises the following concrete steps of: (1) constructing a trinity of forest network, road network and water network and integrating
soil preparation measures of unit module platform field
ditch engineering; (2) baring land,
drying field, freezing and improving soil; (3) carrying out deep
tillage and mature tillage and planting
green manure; and (4) planting the
plant materials of the shelter forests. By adopting the technology disclosed by the invention, the problems that
plant materials of the road shelter forests is low in
survival rate, the accumulation of salt in the surface soil is serious, the structure and the function are unstable and the like can be effectively solved; the
survival rate and the preserving rate of trees are greatly increased; better efficacies of decreasing the alkali, restraining the salt, retaining the water, preserving the soil
moisture, improving the air and the water permeability and increasing the soil
nutrient are provided; and proved by the monitoring for continuous three years, the technology disclosed by the invention is suitable for the road shelter forests construction in the heavy
saline-
alkali soil sections of the coastal areas.