Municipal road guardrail and construction method thereof
A technology for municipal roads and guardrails, applied to roads, roads, road safety devices, etc., can solve the problems of serious road damage and inconvenient installation, and achieve the effect of convenient installation and disassembly
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0024] Such as figure 1 , 2 , 3, the municipal road guardrail described in this embodiment includes a railing 1 and a circular base 2, and the base 2 is provided with mounting holes 3 distributed in a circle; 131 and the perforation 132 located at the bottom; it is characterized in that a pre-embedded pipe 4 pre-buried in the road 10 is arranged under the installation hole 3, such as Figure 4 , 5 As shown, the inner chamber of the embedded pipe 4 is divided into an upper chamber 5 and a lower chamber 6 by a step 15, and the inner diameter of the upper chamber 5 is smaller than that of the lower chamber 6; a hollow pipe 8 with a flange 7 on the top is provided in the embedded pipe 4; The hollow tube 8 passes through the perforation 132, and the flange 7 is located in the reaming hole 131. There is a gap between the hollow tube 8 and the inner wall of the upper cavity 5, and the gap is generally 2-3 mm. The lower part of the tube 8 is provided with a plurality of bead holes ...
Embodiment 2
[0037] Such as Image 6 As shown, the municipal road guardrail described in this embodiment is different from Embodiment 1 in that: the bottom surface of the flange 7 is provided with teeth 26, the existence of the teeth 26, the flange 7 is stressed during disassembly, and the flange 7 below The base part is easier to crush and easy to disassemble.
Embodiment 3
[0039] The construction method of another kind of municipal road guardrail designed by the present invention is characterized in that comprising the following steps:
[0040]Embed the pre-embedded pipe 4 in the road 10, and the position of the pre-embedded pipe 4 corresponds to the installation hole 3;
[0041] Set the municipal road guardrail on the road 10 so that the installation hole 3 corresponds to the position of the embedded pipe 4;
[0042] Put the ball 11 into the bead hole 9 on the inner wall of the hollow tube 8, insert the hollow tube 8 into one of the mounting holes 3
[0043] And in the embedded pipe 4;
[0044] Nail 12 is inserted in the hollow pipe 8;
[0045] Adopt a pressing device 17, such as Figure 7 Shown, this hold-down device 17 is made of vertical bar 18, upper arc-shaped bar 19, lower arc-shaped bar 20, supporting foot 21, slip ring 22 and staving 23, and vertical bar 18 is left and right two, and every vertical bar 18 A said slip ring 22 is arra...