A 300-meter high dam and its construction technology
A dam, meter-level technology, applied in the field of dams and their construction technology, can solve problems such as being unsuitable for building dams, and achieve the effects of good stability, ecological environment protection, and material resource conservation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0042] The specific embodiments of the present invention will be described in further detail below in conjunction with the accompanying drawings.
[0043] Such as image 3As shown, a 300-meter-high dam, the dam includes: a cemented sand and gravel dam located at a low position upstream of the dam and a construction height of 70-100 meters, located on the cemented sand and gravel dam, A concrete face rockfill dam with a building height of 200-230 meters, the concrete face rockfill dam includes: from upstream to downstream, the first concrete face 17, the first cushion layer 18, the second cushion layer 19, The first rockfill area 20, the second rockfill area 21 and the block stone slope protection 22 on the back surface, the cemented sand gravel dam includes the cemented sand gravel concrete 16 rich in slurry at the base and the cemented sand gravel concrete 16 in the rich slurry Concrete 15 on top of cemented sand and gravel.
[0044] The glue consumption of described cement...