Non-load-balancing route switching method and device

A switching device and non-load technology, which is applied in the field of communication, can solve the problems of reducing routing switching efficiency, switching time-consuming routing switching time, and damaging user experience.

Active Publication Date: 2017-02-08
MAIPU COMM TECH CO LTD
View PDF4 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In the process of routing switching, the routing switching time is a very important indicator. Since the existing FRR mechanism and BFD mechanism consume less time, the switching time of the data layer often has a greater impact on the routing switching time.
Although the above routing switching method can update the routing prefix and its corresponding next hop information, it often takes a lot of time to delete the original routing prefix and the next hop information associated with the original routing prefix. When the next-hop information associated with the route prefix that needs to be updated is large, that is, when the amount of routes to be switched is large, the above-mentioned route switching method needs to update each new route prefix and associated next-hop information to achieve route switching. Purpose, resulting in a longer time consumed, which increases the overall routing switching time, reduces the efficiency of routing switching, and damages the user experience

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Non-load-balancing route switching method and device
  • Non-load-balancing route switching method and device
  • Non-load-balancing route switching method and device

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0013] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0014] In order to clearly describe the technical solutions of the embodiments of the present invention, in the embodiments of the present invention, words such as "first" and "second" are used to distinguish the same or similar items with basically the same functions and functions. A skilled person can understand that words such as "first" and "second" do not limit the quantity and execution order.

[0015] Routing means that a router receives a data packet f...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a non-load-balancing route switching method and device, relates to the communication field, and aims at realizing route switching by updating next-hop information of an ECMP resource when the amount of routes that need switching is large. The method comprises that route information is obtained, the route information is grouped according to main and standby next-hop information to generate grouped route information, a corresponding equivalent route ECMP resource is generated for each grouped route information, next-hop information of the ECMP resource is associated with main next-hop information of the grouped route information corresponding to the ECMP resource, and a route prefix of the ECMP resource is set as a route prefix of the grouped route information corresponding to the ECMP resource; and a path indicated by the next-hop information of the ECMP resource is detected, and when it is determined that the path indicated by the next-hop information of the ECMP resource has a fault, the next-hop information of the ECMP resource is associated with backup next-hop information of the grouped route information corresponding to the ECMP resource. The method and device are used for route switching.

Description

technical field [0001] The present invention relates to the communication field, in particular to a non-load balancing routing switching method and device. Background technique [0002] With the increasing importance of the network carrying services, the reliability requirements of the network in network communication are also getting higher and higher. In order to meet this requirement, when sending data through the network, if there are multiple paths between the source address and the destination address, the reliability can be improved by means of active and standby route backup, that is, the data is routed between the source address and the destination address In general, the data is routed to the main path for forwarding. When the main path fails, the data is routed to the backup path for forwarding. After the failure of the main path is eliminated, the data is routed to the The main path is sent. [0003] Route switching for services deployed in the active / standby r...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): H04L12/711H04L12/703H04L45/247H04L45/28
CPCH04L45/22H04L45/28
Inventor 谯良刚
Owner MAIPU COMM TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products