Peak valley power utilization oriented intelligent household electrical appliance control method and gateway
A home appliance control and intelligent technology, applied in home automation network, data exchange through path configuration, electrical components, etc., can solve the problems that cannot fully reflect the economic and social benefits of peak and valley electricity consumption, so as to alleviate the gap between supply and demand, reduce the The effect of electricity costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0092] Such as image 3 Shown, embodiment one comprises the following steps:
[0093] Step 1: The gateway pre-acquires the start time T of the low-peak power consumption period of the location bg and end time T end . The acquisition method can be input by the user, or can automatically query the cloud platform or a third-party server.
[0094] Step 2: The gateway receives the smart home appliance appointment operation instruction sent by the user.
[0095] Step 3: The gateway obtains the target operation execution time T according to the target operation type and the objective environmental data of the home appliance (such as indoor temperature, current water temperature of the water heater, etc.) op . The acquisition method can be directly calculated by the gateway, or can automatically query the cloud platform or a third-party server.
[0096] Step 4: Gateway according to T op , T fn with T bg , T end The relationship between the T st optimize. Step 4 includes th...
specific Embodiment
[0119] Taking a specific scenario where a user makes an appointment to control a washing machine washer through a gateway as an example, the smart home appliance control solution proposed by the present invention is described in detail. Assume that the start time T of the off-peak power consumption period in the user's location bg =22, end time T end =7; the maximum allowable advance T of the actual completion time of the operation fn =2h. Specific steps are as follows:
[0120] Step 1: The user enters T at the gateway in advance bg =22,T end =7.
[0121] Step 2: The user sends a washing machine reservation operation instruction to the gateway in the afternoon, the operation type is "laundry program X", and the reservation operation completion time is T fn =8, that is, 8 o'clock in the morning of the next day.
[0122] Step 3: After the gateway receives the reservation operation instruction sent by the user, it queries the cloud platform to obtain the execution time T o...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com