A Correction Method for Baseline Value of Network Loss During Assessment Period
A benchmark value, network loss technology, applied in data processing applications, system integration technology, instruments, etc., can solve problems such as narrow external transmission channels, insufficient peak shaving capacity of conventional power supplies, and inability to meet the development needs of large-scale new energy bases
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] The present invention will be further described below in conjunction with the accompanying drawings. The following examples are only used to illustrate the technical solution of the present invention more clearly, but not to limit the protection scope of the present invention.
[0026] Such as figure 1 As shown, a method for correcting the baseline value of network loss during the assessment period includes the following steps:
[0027] Step 1, define the duration of an assessment period.
[0028] Step 2, find out the network loss Loss after the system implements the coordinated control strategy of the power grid a , Loss a It can be found through the power grid operation log.
[0029] Step 3, calculate the system power consumption l in the i-th reference period corresponding to the assessment period i .
[0030] The calculation formula is:
[0031]
[0032] Among them, t i is the duration of the i-th reference period, and p(t) is the power grid load curve in...