Project total-factor management platform

A management platform and all-element technology, applied in the field of electric power engineering, can solve the problems of construction status reporting, low project management efficiency, and the inability of the project leader to understand the project status in real time, so as to improve the efficiency of project management.

Inactive Publication Date: 2017-05-31
BEIJING FOREVER TECH
View PDF3 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, in this project management method, the managers cannot report the construction status in real time, resulting in the project leader not being able to understand the project status in real time, which is not conducive to timely and e

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Project total-factor management platform
  • Project total-factor management platform
  • Project total-factor management platform

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0033] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0034] see figure 1 , this embodiment discloses a management platform for all elements of engineering, which is applied to a mobile terminal, and the mobile terminal can be a smart phone or a tablet computer. Specifically, it is applied to a WeChat platform in a mobile terminal, specifically including:

[0035] The project maintenance module 101 is used to create new project information, adjust project information, and delete project information; the project m...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a project total-factor management platform, which is applied to a mobile terminal. Mobile interconnection is combined with a conventional infrastructure project management service to enable a manager to manage and control the whole process in an electric power project on the mobile terminal in real time. The project total-factor management platform comprises a project maintenance module, a project monitoring module, a work to be finished module and a project diagnosis module. The manager can maintain project information in real time, monitor the project progress and report problems in a construction process in real time for a leader to master the construction state and solve the problems in real time. In addition, a work to be finished prompting and prewarning function is provided, so that the manager can be prompted to deal with work to be finished and timely arrange work after receiving prewarning information. The project total-factor management platform also has a project diagnosis function, the total number of projects, constructed projects, commissioned projects, delayed projects and normal projects are displayed, and the project progress of each project is displayed. By the project total-factor management platform, the project management efficiency is effectively improved.

Description

technical field [0001] The present invention relates to the field of electric power engineering, and more specifically, relates to an engineering all-element management platform. Background technique [0002] The whole process of the infrastructure project is roughly divided into four stages: the early stage of the project, the early stage of the project and construction, the completion and commissioning of the project, and the handover of operation. According to the current whole process, there are many managements and controls, involving multiple units and departments, and the whole process of the infrastructure project involves massive management data. [0003] At present, most of the project management work is carried out offline. The management personnel go to the construction site to understand the construction status, generally use paper and pen to record, and then report the current construction status of the project in the form of a report after sorting out, so that ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/10G06Q50/08
CPCG06Q10/103G06Q50/08
Inventor 江春华罗新伟陈晓龙杨志鹏陈显龙陈洪兴孙敏杰
Owner BEIJING FOREVER TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products