A Two-Level Programming Method for Distribution Networks Considering Timing and Reliability

A two-level planning and distribution network technology, applied in the direction of electrical digital data processing, data processing applications, instruments, etc., can solve problems such as DG and load timing without consideration

Active Publication Date: 2020-08-14
STATE GRID FUJIAN ELECTRIC POWER CO LTD +2
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The purpose of the present invention is to provide a two-tier distribution network planning method considering timing and reliability. This method solves the problem that the existing distribution network planning method does not consider the timing of DG and load, and immediately To achieve a certain reliability goal, and at the same time solve the cumbersome problem of infeasible solution repair in the model solving algorithm, improve the technical economy of the distribution network planning scheme, and achieve the established power supply reliability goal while realizing the optimal configuration of distributed power sources

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A Two-Level Programming Method for Distribution Networks Considering Timing and Reliability
  • A Two-Level Programming Method for Distribution Networks Considering Timing and Reliability
  • A Two-Level Programming Method for Distribution Networks Considering Timing and Reliability

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0065] The technical solution of the present invention will be specifically described below in conjunction with the accompanying drawings.

[0066] Such as figure 1 As shown, a two-tier planning method for distribution network considering timing and reliability of the present invention includes the following steps,

[0067] S1. Establish corresponding four-season typical daily time-series curve models for the wind power generation, photovoltaic power generation output and load power in the distribution network;

[0068] S2. Perform multi-scenario chance constraint processing on the model in step S1;

[0069] S3. Establish a distribution network bi-level programming mathematical model considering timing and reliability, including objective functions and constraints;

[0070] S4. Applying the particle swarm optimization algorithm to solve the mathematical model in step S3, and using the minimum spanning tree method to ensure the radiation and connectivity structure of the dist...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a power distribution network double layer planning method considering the time sequence and the reliability. The method comprises: according to the meteorological files and the load power statistical data, obtaining the typical daily power time sequence curves of the wind electricity, the photovoltaic output and the load in different seasons; based on the opportunistic constraint planning method, creating a power distribution network framework and a distributed power capacity double layer planning mathematical model, including the objective function and the constraint condition; using the particle swarm optimization algorithm to solve the model and using the minimum spanning tree algorithm to ensure the radiation and connectivity structure of the distribution network during the iterative process; and obtaining the target network framework and the Pareto optimal solution set of the distributed power capacity so as to generate the best planning scheme. The invention solves the problems that unnecessary investment into the a power distribution network incurred by the fact that a traditional power distribution network planning method containing a distributed power supply cannot reflect the typical output characteristic of a distribution type new energy; and 2) that by incorporating the power distribution network power supply reliability into a model target function, the reliability target can be realized at the planning stage.

Description

technical field [0001] The invention belongs to the technical field of distribution network planning, and in particular relates to a two-layer planning method of distribution network considering timing and reliability. Background technique [0002] The increase of the proportion of distributed generation (DG) in the power grid increases the uncertainty of distribution network planning. Traditional distribution network planning treats distributed power sources as fixed power sources, which obviously does not conform to the operating characteristics of distributed power sources; or assumes that wind power or photovoltaic output obeys certain distribution characteristics, and then uses sampling methods such as Monte Carlo to randomize DG Sampling simulates its output, but it does not reflect the change of DG output with power supply season and time period, and often ignores the uncertainty of load. In addition, the general distribution network planning model often takes econom...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): G06F113/04
CPCG06Q10/04G06Q50/06
Inventor 郑洁云张林垚胡梦月胡志坚胡美玉
Owner STATE GRID FUJIAN ELECTRIC POWER CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products