Design method of a railway signal machine system
A railway signal machine and design method technology, applied in the direction of railway signals, visual signals, railway car body parts, etc., can solve the problems of poor scalability, low work efficiency, inconvenient adjustment of cables, etc., and achieve the effect of short response time and high sensitivity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0028] Example 1: Signal lamp driver generation process
[0029] The software of the signal lamp driver board includes three modules: the signal lamp driver module, the signal lamp operation status acquisition module and the CAN communication module. Through the CAN communication module, the signal light driver board can receive the signal light control scheme issued by the main control board, and the signal light driver module drives the corresponding signal light to work according to the received control scheme. At the same time, the signal lamp driver board can use the signal lamp operation status acquisition module to collect the operation status information of the signal lamp. By processing the collected information, it can judge whether the signal lamp controlled by the signal machine is working normally. state, through the error handling mechanism, firstly send a message of "drive failure" to the main control board, and then control the signal light connected to this bo...
Embodiment 2
[0030] Embodiment 2: The signal acquisition process of the vehicle information acquisition board
[0031] The vehicle information collection board collects a level signal from the DB25 interface every 100ms, and then processes the collected level signal every 500ms. Then, within a period of time, the data record formed by one detector and its corresponding waveform. A 0-1 change plus a 1-0 change constitutes a pulse, the data of a vehicle. For a detector, starting from the value at time 0, the XOR operation is performed sequentially, a 1 will appear when 0 changes to 1, and a 1 will appear when 1 changes to 0, so that several 1s will appear within a period of time. Because two 1s count as a pulse, that is, a car, so divide the number of 1s by 2 and take an integer (there may be a 1-0 transition at the beginning, or a 0-1 transition at the end, In this way, the number of 1 is an odd number, which cannot be divided by 2), and the traffic flow during this period can be obtained...
Embodiment 3
[0035] Embodiment 3: The station work process of the signal machine
[0036] Take a three-way station as an example, as follows:
[0037] The station has a total of 7 signal racks, namely X, 51, Sfl, 53, DI, D3, DS, and a total of 20 light positions S3L, respectively: XU, XL, XH, XD, XZU, SIL, SIH , SIB, S11L, S11H, S11B, S3H, S3B, DIB, DIA, D3B, D3A, DSB, DSA.
[0038] The above 7 signal machines, the corresponding lighting combinations are XJX combination, 51, Sn and 53FX combination, and DX combination. The corresponding signal relays that need to be collected are:
[0039] X (LXJ, ZXJ, YXJ, TXJ, YSXJ)
[0040] 51, 511, 53 (LXJ, DXJ)
[0041] DI, D3, DS(DX)
[0042] Through the logical combination of functions, the following possibilities are obtained:
[0043] XL=LXJ&ZXJ&TXJ&1DJ
[0044] XIU=LXJ&ZXJ&! TXJ&IDJorLXJ&! ZXJ&ZDJ&IDJ
[0045] XZU=LXJ&! ZXJ&! TXJ
[0046] XH==! LXJ&IDJ
[0047] XB=! LJ&YXJ
[0048] 5IL-5ILXJ&! SIDXJ
[0049] 5IH=! 5ILXJ&! SIDX...