An automatic analysis system and automatic analysis method for project due diligence
An automatic analysis system and automatic analysis technology, applied in the field of project due diligence technical preparation, can solve problems such as complex content, difficult key information for the consulting team, and failure to keep up with the development pace of the information age, so as to achieve comprehensive analysis results
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] An automatic project due diligence analysis system is characterized in that it includes the following components:
[0036] The central computer is responsible for all information processing and computing power, and it has a central memory.
[0037] The project legal information storage, which contains the project legal information database, is used to record the information contained in the project-related legal materials, and store all the information in their own entries. The information contained in the project-related legal materials here includes but is not limited to All fixed asset documents involved in the project, evaluation reports of all fixed assets involved in the project, documents of all intangible assets involved in the project, evaluation reports of all intangible assets involved in the project, all contracts involving payment obligations or burdens as obligations, and contracts appendix.
[0038] The project financial information storage, which contai...
Embodiment 2
[0059] An automatic project due diligence analysis system is characterized in that it includes the following components:
[0060] The central computer is responsible for all information processing and computing power, and it has a central memory.
[0061] The project legal information storage, which contains the project legal information database, is used to record the information contained in the project-related legal materials, and store all the information in their own entries. The information contained in the project-related legal materials here includes but is not limited to All fixed asset documents involved in the project, evaluation reports of all fixed assets involved in the project, documents of all intangible assets involved in the project, evaluation reports of all intangible assets involved in the project, all contracts involving payment obligations or burdens as obligations, and contracts appendix.
[0062] The project financial information storage, which contai...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com