Resource maintenance method and device
A resource and user technology, applied in the communication field, can solve problems such as high signaling overhead and extended user service access time
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0056] Such as figure 2 As shown, the embodiment of the present invention provides a resource maintenance method, the method includes:
[0057] Step 201: After the gateway station passes the first preset time period starting from the end time of the user service, it judges whether other user services other than the user service are connected to the resources accessed by the user service.
[0058] When a user service requests access to the gateway station, the gateway station allocates resources for the user service according to the user's service requirements. The resource comes from the allocation of the operation control center, which can be pre-allocated by the operation control center Real-time distribution by the control center. Usually, if the resources pre-allocated to the gateway station cannot meet the needs of user services, the gateway station applies to the operation and control center for real-time allocation of resources. The resources can be carrier resources,...
Embodiment 2
[0093] In combination with the first embodiment above, the embodiment of the present invention also provides a resource maintenance device, which can adopt figure 2 For the method provided by the corresponding embodiment one, refer to Figure 5 As shown, the resource maintenance apparatus 500 includes: a judging unit 501 and a determining unit 502 .
[0094] The judging unit 501 is configured to judge whether other user services other than the user services are accessed on the resources accessed by the user services after a first preset time period starting from the end time of the user services;
[0095] The determination unit 502 is configured to determine whether to release the resource according to the determination result of the determination unit 501 .
[0096] Optionally, the judging unit 501 is also used for:
[0097] In the second preset time period starting from the end time of the user service, it is judged whether there are other user service access resources ex...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


