A very small clean distance from the tunnel to the hole construction method
A construction method and tunnel technology, applied in tunnels, tunnel linings, earthwork drilling, etc., can solve the problems of high cost, complex structural stress, long construction period, etc., and achieve the goals of avoiding damage, reducing settlement convergence, and reducing disturbance Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039] The embodiments of the present invention will be described in detail below with reference to the accompanying drawings, but the present invention can be implemented in various ways defined and covered by the claims.
[0040] A construction method for exiting a tunnel with a very small clear distance, the embodiment is described through the actual application of the tunnel excavation process. The implementation is the construction of the old house foundation tunnel of the Xingyi Ring Expressway in Guizhou Province, with a total length of about 393m, which is a bifurcated short tunnel. The distance between the tunnel lines at the exit section is 0.6m from the minimum contour line, and then gradually divided into very small net distance, small net distance, and separate tunnels, and the line distance at the entrance section is about 35m. In the actual construction process, the effect is remarkable. It solves the technical problems of many construction procedures, complex s...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com