Method of adjacent buildings protection and tunnel foundation pit excavation in urban large section open excavation tunnel

A technology for open-cut tunnels and buildings, applied in excavation, construction, underwater structures, etc., can solve problems such as uneven settlement, large mutual interference, and hidden safety hazards, and achieve easy popularization and application, safe and efficient construction, and reduced impact. Effect

Inactive Publication Date: 2018-11-23
THE 2ND ENG OF THE 12TH BUREAU GROUP OF CHINA RAILWAY +1
View PDF3 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] In the construction of large-section open-cut tunnels adjacent to buildings in the city, the tall buildings adjacent to the tunnel foundation pit will generate large unbalanced stresses on the surrounding strata and foundation pits, and it is easy to cause unbalanced damage to the buildings adjacent to the foundation pit during the tunnel excavation process. Uniform settlement and inclination affect the function and safety of the building, and there are certain potential safety hazards; the traditional construction method is slow in progress, low in efficiency, poor in the circular connection of the excavation surface, and has large mutual interference, and the construction quality cannot be fully guaranteed. Therefore, Need to choose a construction method that can adapt to geological changes and transition quickly

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method of adjacent buildings protection and tunnel foundation pit excavation in urban large section open excavation tunnel
  • Method of adjacent buildings protection and tunnel foundation pit excavation in urban large section open excavation tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment approach

[0027] According to an embodiment of the present invention, preferably, the foundation pit enclosure structure 2 is an underground continuous wall.

[0028] According to an embodiment of the present invention, preferably, the distance between the preset position of the foundation pit enclosure structure 2 and the adjacent building 1 is at least 1 / 4 of the width of the foundation pit. For example, the design width of the foundation pit is 18 meters, and the distance between the preset position of the foundation pit enclosure structure 2 and the adjacent building 1 is at least 4.5 meters, so as to ensure the safety of the adjacent building 1 .

[0029] According to an embodiment of the present invention, the first predetermined length is greater than the length of the adjacent building 1 along the excavation direction. Preferably, the first predetermined length of the first isolation structure is respectively 5 meters beyond both ends of the adjacent building 1 , so as to bette...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a method of adjacent buildings protection and tunnel foundation pit excavation in urban large section open excavation tunnel, which includes the following steps: 1) before the excavation of the tunnel foundation pit, a first isolation structure of a first predetermined length is arranged along the excavation direction of adjacent buildings in a soil layer between adjacent buildings and a preset position of the enclosure structure of foundation pit; 2) a second isolation structure of a second predetermined length is arranged at both sides of the preset position of the enclosure structure of foundation pit; 3) the enclosure structure of foundation pit is applied to the preset position of the enclosure structure of foundation pit; 4) a tunnel foundation pit is excavatedin section. The method of adjacent buildings protection and tunnel foundation pit excavation in urban large section open excavation tunnel has the advantages of safe and efficient construction, easyoperation, and easy application.

Description

technical field [0001] The invention relates to the technical field of tunnel construction, in particular to a method for protecting buildings adjacent to urban large-section open-cut tunnels and excavating tunnel foundation pits. Background technique [0002] In the construction of large-section open-cut tunnels adjacent to buildings in the city, the tall buildings adjacent to the tunnel foundation pit will generate large unbalanced stresses on the surrounding strata and foundation pits, and it is easy to cause unbalanced damage to the buildings adjacent to the foundation pit during the tunnel excavation process. Uniform settlement and inclination affect the function and safety of the building, and there are certain potential safety hazards; the traditional construction method is slow in progress, low in efficiency, poor in the circular connection of the excavation surface, and has large mutual interference, and the construction quality cannot be fully guaranteed. Therefore,...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D29/045E02D17/04
CPCE02D17/04E02D29/045
Inventor 王海斌李钢李学荣乔国华王昭军吉艳雷
Owner THE 2ND ENG OF THE 12TH BUREAU GROUP OF CHINA RAILWAY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products