Embodiment 1
[0019] A cement slurry transfer equipment when laying bricks, such as Figure 1-3 As shown, it includes a support plate 1, a bracket 2, a fixing device 3, a first connecting block 4, an arc-shaped rod 5, a first connecting rod 6, an electric winding wheel 7, a pull wire 8, a hook 9, and a second guide sleeve 11. , Straight guide rod 12 and pulley 13, support plate 1 is provided with brackets 2 on the left and right sides of the bottom, support plate 1 is provided with a fixing device 3, and the top left of the fixing device 3 is provided with a first connecting block 4, the first connection The top of the block 4 is provided with an arc-shaped rod 5, the left end of the arc-shaped rod 5 is provided with a first connecting rod 6, and the front end of the first connecting rod 6 is provided with an electric winding wheel 7, and the electric winding wheel 7 is wound with a cable 8 and a cable 8. A hook 9 is provided at the lower end, a cement bucket 10 is hung on the hook 9, a seco...
Embodiment 2
[0021] A cement slurry transfer equipment when laying bricks, such as Figure 1-3 As shown, it includes a support plate 1, a bracket 2, a fixing device 3, a first connecting block 4, an arc-shaped rod 5, a first connecting rod 6, an electric winding wheel 7, a pull wire 8, a hook 9, and a second guide sleeve 11. , Straight guide rod 12 and pulley 13, support plate 1 is provided with brackets 2 on the left and right sides of the bottom, support plate 1 is provided with a fixing device 3, and the top left of the fixing device 3 is provided with a first connecting block 4, the first connection The top of the block 4 is provided with an arc-shaped rod 5, the left end of the arc-shaped rod 5 is provided with a first connecting rod 6, and the front end of the first connecting rod 6 is provided with an electric winding wheel 7, and the electric winding wheel 7 is wound with a cable 8 and a cable 8. A hook 9 is provided at the lower end, a cement bucket 10 is hung on the hook 9, a seco...
Embodiment 3
[0024] A cement slurry transfer equipment when laying bricks, such as Figure 1-3 As shown, it includes a support plate 1, a bracket 2, a fixing device 3, a first connecting block 4, an arc-shaped rod 5, a first connecting rod 6, an electric winding wheel 7, a pull wire 8, a hook 9, and a second guide sleeve 11. , Straight guide rod 12 and pulley 13, support plate 1 is provided with brackets 2 on the left and right sides of the bottom, support plate 1 is provided with a fixing device 3, and the top left of the fixing device 3 is provided with a first connecting block 4, the first connection The top of the block 4 is provided with an arc-shaped rod 5, the left end of the arc-shaped rod 5 is provided with a first connecting rod 6, and the front end of the first connecting rod 6 is provided with an electric winding wheel 7, and the electric winding wheel 7 is wound with a cable 8 and a cable 8. A hook 9 is provided at the lower end, a cement bucket 10 is hung on the hook 9, a seco...