Half-covered digging metro station foundation pit steel support parallel support erecting method and structure
A subway station, steel support technology, applied in the direction of basic structure engineering, excavation, underwater structures, etc., can solve the problems that the steel support cannot be lowered horizontally, the steel support cannot be erected, and mechanical equipment cannot be adopted. Achieve the effects of optimizing the support structure in the station, reducing installation and dismantling time, and avoiding erection risks
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0042] The present invention will be further described below in conjunction with the accompanying drawings. Such as figure 1 , figure 2 and image 3 The steel support and erection structure shown in the construction of a half-covered excavation subway station includes a foundation pit enclosure structure 1, a bedding structure erected at the foundation pit opening and covering the general foundation pit 8, and a first road erected in the foundation pit The steel support 6 and the second steel support 4, the enclosure structure of the foundation pit shown adopts an underground diaphragm wall, or bored cast-in-place piles, or artificially dug piles. The blanket structure 8 includes a plurality of temporary pillars 8-1, crossbeams 8-2, longitudinal connecting beams 8-3 and blankets 8-4, and the plurality of temporary pillars 8-1 are equidistantly arranged in the middle of the foundation pit, and the foundation pit The pit is divided into two parts, and its multiple longitudin...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


