Flash drying device for paint applied to road marking
A technology for rapid drying and road marking, which is applied in the field of paint processing, can solve the problems of inconvenient installation in cleaning, lower work efficiency, and short drying time in the drying box, so as to prolong the drying time and prevent paint The effect of dirt accumulation and easy cleaning
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0026] Embodiment 1, when working, first install the dryer 6 on the inner wall and the bottom of the auxiliary plate 7, place the fixing plate 10 in the through hole in the middle of the side wall of the drying box 1, and insert the jack 11 into the side wall , and insert the locking screw into one side of the fixing plate 10 through the socket 11, and lock and fix it so that the slanting plate 8 is just at the figure 1 In the position shown, the first conveyor belt 2 and the second conveyor belt 3 are automatically rotated, the first conveyor belt 2 rotates clockwise, the second conveyor belt 3 rotates counterclockwise, and the dryer 6 is started, and then the paint is transferred from the first conveyor belt 2 above It falls sideways, falls on the first conveyor belt 2 and then conveys to the right side, the dryer 6 dries the passing paint, and when the paint reaches the right end of the first conveyor belt 2, it falls on the inclined plate 8, And flow in from the entrance o...
Embodiment 2
[0027] Embodiment 2, when cleaning, first open the side door to take out the dryer 6, pull the trigger to move the baffle 14 to the left, then place the installation plate 13 between the inner walls, and press the drive ball and the spray head 15 switch (the drive ball and the spray head 15 are all provided with a switch), then the baffle plate 14 is moved back so that its projection is inserted into the mounting plate 13 one side, and then water is poured from the mounting plate 13 upper end (the mounting plate 13 inside It is a cavity, and the upper end is open), so that water flows into the spray head 15 to clean the drying box 1. When cleaning, the first conveyor belt 2 and the second conveyor belt 3 are started at the same time, so that the water can flow into the arc channel 82 Cleaning, while driving the ball to drive the spray head 15 to slide back and forth on the bottom side of the installation rod 16, close the first conveyor belt 2 and the second conveyor belt 3 aft...