Shield construction method for shallow buried section under lake
A construction method and shallow burial technology, which can be used in earthwork drilling, underground chambers, shaft equipment, etc., and can solve problems such as long duration.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] The preferred embodiments of the present invention will be described in detail below with reference to the accompanying drawings; it should be understood that the preferred embodiments are only for illustrating the present invention, rather than limiting the protection scope of the present invention.
[0022] Taking the planning and design of a project construction as an example, its engineering geology is as follows: figure 1 As shown, the geology in the interval ranges from top to bottom as plain fill layer, clay layer, silt layer, sand layer, round gravel layer, and mudstone layer. The tunnel crossing is basically located in the round gravel layer. The average thickness of the filling layer is 1.62m, the average thickness of the clay layer is 2.3m, the average thickness of the silt layer is 6m, the average thickness of the sand layer is 1.8m, and the average thickness of the round gravel layer is 10.25m. The average thickness of mudstone is 2.73m. The buried depth o...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com