A method for constructing a risk evaluation model of green building material product authentication
A technology of green building materials and risk assessment, which is applied in the field of green building materials product certification risk assessment model construction, and can solve the problems of unknowable product certification risks
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0043] First, the embodiment of the present invention provides a method for constructing a green building material product certification risk assessment model. The model can be used to assess the green building material product certification risk. The flow chart is as follows figure 1 shown, including the following process:
[0044] S1. Acquiring index parameters of green building material product certification, the index parameters are determined according to certification nodes and risk points.
[0045] Among them, some nodes are selected from the nodes in the green building material product certification process as the first-level index parameters; the risk points of the first-level index parameters are obtained, and some of the risk points are selected as the second-level index parameters. Specifically, based on the certification process of the "Green Product Certification Implementation Rules for Ceramic Tiles (Boards)" issued by the National Certification and Accreditati...
Embodiment 2
[0064] In order to solve the problems existing in the prior art, the present invention also proposes a method for detecting the certification risk of green building materials products, which includes the following steps:
[0065] Obtain the index parameters of green building material product certification;
[0066] The index parameter input adopts the green building material product certification risk model that embodiment 1 establishes;
[0067] According to the output value of the green building material product certification risk model, the risk of the green building material product certification is judged. If it is higher than the preset risk threshold, there is a relatively large risk.
[0068] The green building material product certification risk detection method is used to evaluate the risk of the green building material product certification process based on the improved BP neural network, by first determining the structure and related parameters of the BP neural net...
Embodiment 3
[0113] Figure 4 It is a schematic diagram of the hardware structure of the electronic device performing the processing method for list item operations provided by the embodiment of the present invention, as shown in Figure 4 As shown, the device includes one or more processors 410 and memory 420, Figure 4 A processor 410 is taken as an example.
[0114] The processor 410 and the memory 420 may be connected via a bus or in other ways, Figure 4 Take connection via bus as an example.
[0115] The processor 410 may be a central processing unit (Central Processing Unit, CPU). The processor 410 may also be other general-purpose processors, digital signal processors (Digital Signal Processor, DSP), application-specific integrated circuits (Application Specific Integrated Circuit, ASIC), field-programmable gate arrays (Field-Programmable Gate Array, FPGA) or other programmable logic devices, discrete Chips such as gate or transistor logic devices, discrete hardware components,...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com