Receiving model test platform and test method of tunnel boring machine with mechanical method
A communication channel and model test technology, which is applied to the receiving model test platform of the mechanical method communication channel roadheader, can solve the problems of large impact on the surrounding environment, long construction period, and high construction cost, and achieve the effect of improving the development of shield tunneling technology
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment
[0024] A receiving model test platform for mechanical contact tunnel boring machine, such as figure 1 , figure 2 , image 3 , Figure 4 , Figure 5 and Figure 6 As shown, it includes multi-ring segment test unit 1, multi-ring segment hydraulic servo earth pressure simulation system 2 and communication channel formation simulation system 3;
[0025] The multi-ring segment test unit 1 is formed by splicing segments and is used to simulate the structural state of real tunnel segments;
[0026] The multi-ring segment hydraulic servo earth pressure simulation system 2 is used to simulate the real tunnel shape to apply earth pressure load to the multi-ring segment test unit 1;
[0027] The contact channel stratum simulation system 3 is used to simulate the stratum soil environment suffered by the multi-ring segment test unit 1 during the mechanical construction of the contact channel;
[0028] The communication channel stratum simulation system 3 includes a vertical fixed fr...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


