AGC evaluation and assessment method and device adapted to multi-region interconnected power grid
An interconnected grid and multi-regional technology, applied in the direction of circuit devices, electrical components, AC network circuits, etc., can solve problems such as poor regulation performance, reduced enthusiasm for AGC adjustment in the control area, and frequency fluctuations in the interconnected grid, so as to ensure the safety of the grid frequency Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0061] In the prior art, in response to the frequency control requirements of the regional power grid, a regional dispatch control area is generally established in the regional power grid dispatching center (generally called a branch dispatching center, referred to as sub-dispatching), which is mainly responsible for controlling the frequency and tie lines of the power grid. The effect is evaluated. Within the regional power grid, a provincial dispatch center (referred to as provincial dispatch) is established, and a provincial control area is established in the provincial dispatch, such as figure 1 Provincial control area A, provincial control area B, and provincial control area C shown in , the AGC of the provincial control area is used to implement the routine control of the provincial power grid, and the control goal of the provincial control area can be to maintain the power grid If the frequency is within the control range, the exchange power between this control area an...
Embodiment 2
[0103] An embodiment of the present invention provides an AGC evaluation and assessment device adapted to multi-area interconnected power grids, including:
[0104] An acquisition module, configured to acquire the control modes of each control area;
[0105] The first calculation module is used to collect relevant parameters of each control area and calculate the ACE value of each control area;
[0106] The second calculation module is used to calculate the corresponding assessment index value using different assessment index calculation formulas for the control areas of different control modes based on the ACE value of each control area;
[0107] The evaluation module is used to evaluate the control performance of each control area based on the calculated assessment index values of each control area and in combination with different evaluation principles.
[0108] All the other parts are the same as in Example 1.
[0109] In summary:
[0110] The present invention is app...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


