Watertight device and method of movable rigid boxboard in geotechnical true triaxial test
A true three-axis, leak-proof technology, applied in the direction of applying stable tension/pressure to test the strength of materials, etc., to achieve the effect of simple structure design, high reliability and good safety
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] Example 1, such as figure 1 As shown, a geotechnical true triaxial test mobile rigid box plate water leakage prevention device includes a soil box structure composed of a bottom plate and a mobile rigid box plate set perpendicular to the bottom plate in sequence. The schematic diagram of the soil box structure is shown in Figure 5 As shown, the adjacent mobile rigid box plates can slide relative to each other. The soil box structure is provided with a flexible sealing frame 2 , a sealing fixing strip 3 , flat head screws 4 and a flexible sealing strip 5 . like figure 1 and Figure 4 As shown, the flexible sealing frame 2 is arranged close to the joint of the adjacent mobile rigid box plate 1 and the joint between the bottom plate and the mobile rigid box plate 1, and the flexible sealing frame 2 is pressed by the sealing and fixing strip 3, and the sealing and fixing strip 3 It is fastened on the rigid box plate 1 by flat head screws 4, and the flexible sealing fram...
Embodiment 2
[0033] Embodiment 2, according to the anti-leakage device described in embodiment 1, specifically during operation, follow the steps below to realize the anti-leakage operation:
[0034] (a) Build the earth box structure by moving the rigid box panels 1, and ensure the tight connection between the rigid box panels;
[0035] (b) A flexible sealing strip 5 is placed inside the movable rigid box plate, and a flexible sealing frame 2 is placed inside the earth box structure;
[0036] (c) Install the sealing and fixing strip 3, fasten the sealing and fixing strip 3 and the flexible sealing frame 2 and the moving rigid box plate 1 by flat head screws 4, and ensure that the sealing and fixing strip 3 applies uniform pressure on the flexible sealing frame 2 to ensure There is sufficient contact force between the flexible sealing frame 2 and the flexible sealing strip and the moving box plate;
[0037] (d) Prepare samples in the soil box structure and carry out relevant tests.
[003...