Municipal branch accumulated snow shaking device
A branch and snow technology, applied in the field of municipal branch snow shake-off devices, can solve the problems of high labor intensity, easy to cause colds, etc., and achieve the effect of reducing labor intensity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0019] A municipal branch snow shake off device, such as Figure 1-2 As shown, it includes a support 1, a bearing 2, a first screw rod 3, a rotating plate 31, a first nut 4, a sliding sleeve 5, a hollow sliding rod 6, a first motor 7, a turntable 8, a first support rod 9, a buffer The device 10 and the swing rod 11, the bearing 2 is embedded in the middle of the bottom of the support 1, the first screw 3 that can make the sliding sleeve 5 move up and down is installed in the bearing 2, and the first screw 3 is connected with the bearing 2 through an interference connection. connection, the lower part of the first screw 3 is equipped with a rotating plate 31 that can move the first nut 4 up and down, the first screw 3 is connected with the rotating plate 31 by welding, and the first screw 3 is provided with a threaded connection. The first nut 4 is embedded with a sliding sleeve 5 that can guide the hollow slide bar 6 to move up and down in the middle of the top of the support ...
Embodiment 2
[0021] A municipal branch snow shake off device, such as Figure 1-2 As shown, it includes a support 1, a bearing 2, a first screw rod 3, a rotating plate 31, a first nut 4, a sliding sleeve 5, a hollow sliding rod 6, a first motor 7, a turntable 8, a first support rod 9, a buffer Device 10 and swing rod 11, bearing 2 is embedded in the middle of the bottom in support 1, the first screw rod 3 that can make sliding sleeve 5 move up and down is installed in bearing 2, the bottom of first screw rod 3 is installed with the first nut that can make 4 The rotating plate 31 that moves up and down, the first screw rod 3 is provided with the first nut 4 in a threaded manner, the top middle of the support 1 is embedded with a sliding sleeve 5 that can guide the hollow slide bar 6 to move up and down, the first nut The outer surface of 4 is fixedly connected with hollow slide bar 6, and hollow slide bar 6 passes through sliding sleeve 5, and the first motor 7 that can drive turntable 8 to...
Embodiment 3
[0024] A municipal branch snow shake off device, such as Figure 1-4 As shown, it includes a support 1, a bearing 2, a first screw rod 3, a rotating plate 31, a first nut 4, a sliding sleeve 5, a hollow sliding rod 6, a first motor 7, a turntable 8, a first support rod 9, a buffer Device 10 and swing rod 11, bearing 2 is embedded in the middle of the bottom in support 1, the first screw rod 3 that can make sliding sleeve 5 move up and down is installed in bearing 2, the bottom of first screw rod 3 is installed with the first nut that can make 4 The rotating plate 31 that moves up and down, the first screw rod 3 is provided with the first nut 4 in a threaded manner, the top middle of the support 1 is embedded with a sliding sleeve 5 that can guide the hollow slide bar 6 to move up and down, the first nut The outer surface of 4 is fixedly connected with hollow slide bar 6, and hollow slide bar 6 passes through sliding sleeve 5, and the first motor 7 that can drive turntable 8 to...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com