A high-speed railway, uniform technology, applied in roads, infrastructure engineering, construction, etc., can solve the problems of reducing grouting pressure, slowing down lifting and leveling speed, reducing construction efficiency, etc., to achieve enhanced strength and overall compactness, and improved The effect of improving stability and accuracy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039] The present invention will be described in further detail below in conjunction with the accompanying drawings.
[0040] refer to figure 1 , is a high-speed railway subgrade uneven settlement reinforcement lifting leveling method disclosed by the present invention, comprising the following steps:
[0041] S1 forms a reinforcement zone:
[0042] refer to figure 1 , the reinforcement area formed by static pressure grouting inside the embankment under the railway track to improve the overall compactness and strength of the weak embankment fill layer. combine figure 2 , during static pressure grouting, arrange multiple rows of grouting holes in the reinforcement area on the slope of the embankment, which can be set horizontally or at a downward angle of 10°-30°, using plum blossom-shaped holes with a hole spacing of 2.5m-3.5m, Hole-jumping method is used for construction, and grouting steel pipe permeation grouting reinforcement technology is used for grouting, and the ...