Method for predicting short-term load curve of 110kV main transformer of power grid

A technology of short-term load and forecasting methods, applied in forecasting, instrumentation, data processing applications, etc., can solve problems such as accurate forecasting of load curves, time-consuming and labor-intensive manual operations, and inability to accurately obtain load composition in real time, achieving high accuracy , time-sensitive effect

Active Publication Date: 2019-10-18
GUANGDONG POWER GRID CO LTD +1
View PDF9 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Due to changes in operation mode, equipment maintenance, distribution network ring network transfer, etc., the load composition is often in a dynamic change, and the load composition cannot be obtained accurately in real time, making it impossible to accurately predict the load curve.
At present, manual methods are generally used to analyze the changes in load composition, and then carry out load forecasting based on the historical data of each load component element. Manual work is time-consuming and labor-intensive, and it is difficult to meet the real-time, accurate and efficient requirements of short-term and ultra-short-term load forecasting.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for predicting short-term load curve of 110kV main transformer of power grid
  • Method for predicting short-term load curve of 110kV main transformer of power grid
  • Method for predicting short-term load curve of 110kV main transformer of power grid

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0057] Such as Figure 1 to Figure 5 Shown is the embodiment of the grid 110kV main transformer short-term load curve prediction method of the present invention, comprising the following steps:

[0058] S1. Obtain the predicted current curves of all 10kV feeders of the power grid in the next 48 hours;

[0059] S2. Traversing each 110kV main transformer in the power grid;

[0060] S3. Obtain equipment information, which includes equipment connection relationship, power flow direction, switch status, switch status, and voltage level; establish constraint conditions based on power flow direction and voltage level, and topologically generate all 10kV feeders mounted under the 110kV main transformer;

[0061] S4. Based on the predicted current curves of all 10kV feeders mounted under the 110kV main transformer obtained in step S3 and all 10kV feeders of step S1 in the next 48 hours, superimpose the predicted current curves of all 10kV feeders mounted under the 110kV main transform...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the technical field of power grid dispatching, in particular to a method for predicting short-term load curve of a 110kV main transformer of a power grid. The method comprisesthe following steps of: obtaining predicted current curves of all 10kV feeder lines of a power grid in the future 48 hours; traversing each 110kV main transformer of the power grid; acquiring equipment information, establishing a constraint condition according to a tide direction and a voltage level, and topologically obtaining all 10kV feeder lines mounted under a 110kV main transformer; superposing the prediction current curves of all 10kV feeders mounted under the 110kV main transformer to obtain prediction curve data of the 110kV main transformer; obtaining a predicted load curve of all 110kV main transformers of the power grid in the future 48 hours; and correcting the predicted load curves of all 110kV main transformers in the future 48 hours to form a final 48-hour predicted load curve. Real-time topology analysis can be carried out, the main transformer load composition is rapidly and automatically analyzed through a power failure maintenance single correction mechanism, thenhistorical data of each load composition element is fitted, a main transformer short-term load curve is generated, the timeliness is high, and the accuracy is high.

Description

technical field [0001] The present invention relates to the technical field of power grid dispatching, and more specifically, to a method for predicting short-term load curves of 110kV main transformers in power grids. Background technique [0002] The load forecasting of the main transformer of the power grid is of great significance for improving the management level of the power demand side and serving the power spot market transactions. Traditional load forecasting is mostly carried out for the city's electricity load, and its basic principles and methods are not applicable to the forecasting of a single main transformer. It is strongly related to external factors such as temperature. The main transformer load curve mainly depends on its real-time or future load. Due to changes in operation mode, equipment maintenance, distribution network ring network transfer and other reasons, the load composition is often in dynamic changes, and the load composition cannot be accur...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/04G06Q50/06
CPCG06Q10/04G06Q50/06Y04S10/50
Inventor 李伟周俊宇花洁张越唐鹤骆国铭陈晓彤区允杰钟童科胡福金莫祖森亓玉国罗广锋黄雄浩钟展文区智叶吉宏锋陈刚
Owner GUANGDONG POWER GRID CO LTD