Data transmission method, device and system
A data transmission method and data transmission technology, applied in the field of wireless communication networks, capable of solving problems such as resource conflicts
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0123] The first node schedules data transmission of the second node according to the timing related information reported by the second node.
[0124] In this embodiment, the first node determines the unavailable symbols of the first link or the third link according to the timing related information reported by the second node, that is, determines the unavailable symbols of the second node MT.
[0125] The Hard resources or Soft IA resources of the second node DU are always available to its sub-links (that is, the second link, the fourth link), so the parent backhaul link of the second node (that is, the first link, the third link) Link) data transmission should try to avoid affecting the use of Hard resources or Soft IA resources of the DU.
[0126] The first node receives the timing related information reported by the second node. Wherein, the timing-related information includes at least one of the following:
[0127] The time offset T of the downlink receiving timing of t...
example 1
[0156] Example 1: DU Hard followed by MT Downlink
[0157] In this example, the first node schedules the downlink transmission of the second node after the Hard resource of the DU of the second node. Such as Figure 8a as shown, Figure 8a It is a timing schematic diagram of a data transmission method provided in Embodiment 1 of this application, when ΔT1 is greater than or equal to the threshold T th1 , the DL available symbols of the second node MT (that is, the available symbols of the first link) start from the first symbol after the Hard resource of the second node DU. That is, the number of unavailable symbols of the first link after the Hard resource is 0, that is, only ΔT1 is used as the guard interval. In the figure, the first symbol after the Hard resource of the second node DU is symbol 0 of the next time slot.
[0158] Another example Figure 8b as shown, Figure 8b It is a timing diagram of another data transmission method provided in Embodiment 1 of this ap...
example 2
[0162] Example 2: MT Downlink before DU Hard
[0163] In this example, the first node schedules the downlink transmission of the second node before the Hard resource of the second node DU. Such as Figure 8c as shown, Figure 8c It is a timing schematic diagram of another data transmission method provided in Embodiment 1 of the present application, when T symbol_1 -ΔT1 is greater than or equal to the threshold T th2 , the DL available symbols of the second node MT (that is, the available symbols of the first link) end the second symbol before the Hard resources of the second node DU. That is, the number of unavailable symbols of the first link before the Hard resource is 1. The second symbol before the Hard resource of the second node DU in the figure is the symbol N of the previous time slot symbol -2.
[0164] Another example Figure 8d as shown, Figure 8d It is a timing schematic diagram of another data transmission method provided in Embodiment 1 of the present ap...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


