A connection method and standpipe technology, which is applied in the fields of civil engineering tunnel shield construction and offshore intake and drainage outlet production, can solve problems such as high cost, shortened construction period, disadvantages, etc., and achieve the effect of reliable connection
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0034] In order to make the object, technical solution and beneficial technical effect of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and specific implementation methods. It should be understood that the specific implementations described in this specification are only for explaining the present invention, not for limiting the present invention.
[0035] see Figure 1-2 , the opening connection method of the subsea tunnel and the riser of the present invention comprises the following steps:
[0036] S1. Prefabricate the riser 10, pour low-grade plugging concrete at the bottom of the riser 10, and vertically plant the riser 10 at a designated elevation on the seabed at a designated position.
[0037] The riser 10 of the present invention belongs to the intake / drainage structure, and is used to realize the communication between the subsea tunnel and sea water, and the specific size ...