River ecological water demand determination method
A technology to determine the method and water demand, applied in general water supply conservation, instruments, data processing applications, etc., can solve the problems of affecting the ecological maintenance effect of the river channel and inaccurate water availability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific example
[0110] Table 1 Cross-section characterization rate table
[0111]
[0112] Thus, the guarantee rate of each year within the target time period can be obtained, and the target guarantee rate can be further determined, for example, the target guarantee rate can be determined to be 90%.
[0113] Step S112: Obtain the target time flow in the corresponding year according to the target guarantee rate, and obtain the target time flow under the target guarantee rate.
[0114] After the target guarantee rate is determined, further search for the year corresponding to the target guarantee rate, and then obtain the target time flow according to the year.
[0115] For example: based on the results in Table 1, when the target guarantee rate is determined to be 90%, 1970, the closest guarantee rate of 91.18%, can be determined as the target year, and then the daily natural flow of the section in 1970 can be obtained, and then the target time can be obtained Flow, when the target time is...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com