Heavy overload condition evaluation method of power distribution network line
A line overload and heavy overload technology, applied in the direction of measuring electricity, measuring electrical variables, measuring devices, etc., can solve the problems of no differentiation, heavy overload of distribution network lines without considering the severity and continuity, and improve pertinence Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0067] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings.
[0068] like figure 1 As shown, it is a schematic diagram of the main flow of an embodiment of the method for evaluating the heavy overload situation of distribution network lines provided by the present invention. In this embodiment, the method includes the following steps:
[0069] Step S1, determining parameter information related to evaluation;
[0070] In a specific embodiment, the parameter information related to the evaluation specifically includes:
[0071] Line load rate β (i) , refers to the ratio of the actual value of the line transmission power or current to the rated value;
[0072] Line overload alarm load rate β z , which means that the power or current transmitted by the line has exceeded the overload alarm value, and attention or optimization ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


