A staggered training stampede for lion dance activities
A staggered, training pile technology, applied in sports accessories and other directions, can solve the problems of affecting safety effect, inability to choose tread height and tread area, and single design structure, so as to improve safety protection performance, increase training difficulty, and improve training effect. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0039] as attached figure 1 To attach Figure 9 Shown:
[0040] The present invention provides a staggered training stepping for lion dance activities, comprising: a bearing base 1; the bearing base 1 is designed in a rectangular structure, and the top side of the bearing base 1 is longitudinally provided with two training pile adjustment chute 101, and The top side of the load-bearing base 1 is also provided with two auxiliary protective net adjustment chute 102 in transverse symmetry; the top side of the load-bearing base 1 is provided with a training pile to adjust and fix the sliding column 9, and there are three places for the training pile to adjust and fix the sliding column 9, and The training pile adjustment fixed sliding column 9 in the middle is a fixed structure design, and the training pile adjustment fixed sliding column 9 on both sides is all slid and installed on the inner side of the training pile adjustment chute 101 on the upper side of the bearing base 1 t...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


