A flow distribution control method for the central flue system of a high-rise building
A flue system and control method technology, applied in heating mode, oil fume removal, vertical pipes, etc., can solve the problems of high energy consumption, low efficiency and energy saving, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0071] Such as Figure 1 to Figure 6 As shown, the central flue system of this embodiment includes indoor units 1 installed on different floors, and the air outlets of each indoor unit 1 are communicated with the common flue 3 through their own smoke pipes 2, and installed on the smoke pipes 2 There is a fan flow detection module 4, and the fan flow detection module 4 may use a flow speed detection module or a pressure detection module. The flow distribution control method of the central flue system of a high-rise building pre-sets the indoor unit target flow QL within the target range [Qx, Qd], and the flow distribution control method includes a slave control method and a master control method.
[0072] Wherein, the slave control method includes the following steps:
[0073] ①. Turn on any indoor unit and run at the default speed or gear;
[0074] ②. Detect the current pressure or flow rate through the pressure detection module or speed detection module and calculate the cu...
Embodiment 2
[0113] Such as Figure 7 with Figure 8 As shown, the host in this embodiment is one of the turned-on indoor units 1, and accordingly, the host control method includes the following steps:
[0114] ①, the main machine is turned on first and is in the stand-alone running state;
[0115] ②. Obtain other slave machine startup information and flow information;
[0116] ③. Determine whether the flow rate of the machine at the lowest gear is still higher than the target flow rate,
[0117] If so, increase the target flow QL of the slave machine;
[0118] If not, go to step ④;
[0119] ④. Determine whether the flow rate of the machine at the highest gear is still lower than the target flow rate;
[0120] If so, the flow rate of the machine at the highest gear is still lower than the target flow rate, and the target flow rate of the slave machine should be reduced;
[0121] If not, go to step ⑤;
[0122] ⑤. The host calculates the boot rate and judges whether it is within the s...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com