Problems solved by technology

At present, the dense cutting temporary plugging fracturing technology in the horizontal well section is not yet mature, and there are few relate...

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Shale horizontal well segment inside close cutting temporary plugging fracturing construction optimization method
  • Shale horizontal well segment inside close cutting temporary plugging fracturing construction optimization method
  • Shale horizontal well segment inside close cutting temporary plugging fracturing construction optimization method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0039] Such as figure 1 As shown, the main content of the present invention is a method for optimizing the construction of dense cutting temporary plugging and fracturing in a shale horizontal well section. The main steps include:

[0040] Step S10, obtaining reservoir parameters, well completion parameters, and fracturing operation parameters;

[0041] Among them, reservoir parameters include reservoir thickness, Young's modulus, shear modulus, Poisson's ratio, horizontal maximum principal stress, horizontal minimum principal stress, fracture toughness of reservoir rock, and average length, angle, density, Tensile strength, shear strength, friction coefficient of fracture surface, etc.; completion parameters include perforation cluster number, perforation number and perforation diameter; construction parameters include fracturing fluid rheological parameters, construction displacement, etc. In order to illustrate the optimization method of the present invention, this example...

Embodiment 2

[0076] In order to further illustrate the optimization method of the present invention, the most optimized parameter of construction displacement is still used as an example, and the second embodiment is modified on the basis of the first embodiment, the number of crack clusters is increased from five clusters to seven clusters, and the dense cutting is temporarily carried out. Plugging and fracturing construction displacement optimization.

[0077] Step S10, obtaining reservoir parameters, well completion parameters, and fracturing operation parameters;

[0078] The parameters in Example 2 are shown in Table 1. Only the number of clusters of fractures is changed, which is set to seven clusters. The distribution of natural fractures remains unchanged, and the number of clusters is still used. figure 2 distribution pattern in .

[0079] Step S20, establishing a hydraulic fracturing fluid-solid coupling model through the displacement discontinuity method;

[0080] The establi...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a shale horizontal well segment inside close cutting temporary plugging fracturing construction optimization method. The shale horizontal well segment inside close cutting temporary plugging fracturing construction optimization method comprises the steps that reservoir parameters, well completion parameters and fracturing construction parameters are obtained; a hydraulic fracturing fluid-solid coupling model is established by a displacement discontinuity method; a shale horizontal well segment inside close cutting temporary plugging fracturing crack propagation model isestablished; shale horizontal well segment inside close cutting temporary plugging fracturing crack geometric parameters are calculated based on the reservoir parameters, the well completion parameters and the fracturing construction parameters; and construction parameters are optimized based on the hydraulic crack geometric parameters after segment inside close cutting temporary plugging fracturing and temporary plugging operation results. By means of the shale horizontal well segment inside close cutting temporary plugging fracturing construction optimization method, the applicability of aclose cutting temporary plugging process in shale reservoir reconstruction is improved, and the purposes of optimizing the construction design and improving the development effect are achieved.

Description

technical field [0001] The invention relates to a staged multi-cluster fracturing reconstruction technology for horizontal wells in shale reservoirs in petroleum engineering, in particular to an optimization method for dense cutting temporary plugging and fracturing operations in shale horizontal well sections. [0002] technical background [0003] The development of society is inseparable from the support of energy, and energy supply is related to national security. With the continuous development of China's economy, the demand for oil and gas resources has been increasing year by year, and the gap between the output of domestic oil and gas resources and the import of foreign oil and gas resources has been increasing, which has created a huge hidden danger to the country's economic development and energy security. With the advent of the new era, development concepts such as innovation, coordination, and green dominate the main theme of national economic development, and at ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E21B43/26G06F30/20E21B33/13
CPCE21B43/26E21B43/261E21B33/13E21B47/138E21B2200/20G06F30/20G06F2113/08G06F2111/10E21B47/00E21B49/00
Inventor 杨兆中杨长鑫李小刚易良平贺宇廷
Owner SOUTHWEST PETROLEUM UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products