Water-proof construction method for connecting joint of secondary lining in tunnel
A construction method and joint joint technology, applied in tunnel lining, tunnel, drainage, etc., can solve the problems of water leakage, water leakage, damage and other problems in the joint joint of the secondary lining, and achieve the prevention of water seepage of the secondary lining, low cost and simple construction Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] Such as figure 1 Shown, a kind of anti-seepage construction method of the second liner connecting joint 11 in the tunnel, comprises the following steps:
[0031] Step 1: After the excavation of the surrounding rock 1 of the tunnel, carry out the initial support construction. After the construction of the primary support 2 is completed and before the concrete pouring of the secondary lining, the surface of the primary support 2 is first leveled. The drainage blind pipe is pre-buried between the primary support 2 concrete, and the geotextile is hung, and then the first form and the second lining waterproof board 3 are laid in the circumferential direction at the position of the end formwork on the surface of the initial support 2, and the second form is reserved during laying. The overlapping length of the second lining waterproof board 13 is ≥100mm.
[0032] Step 2: Carry out a circular repair welding of the waterproof board at the overlapping position of the first mold...